| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹30.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.9 LRejected-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹30.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S.J M Constructions L1 | M/S. ABL CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Renewal BT Road to TNHB Kamarajar Road from plot No.6259 to 6333,6062 to 6228 5899 to 6040 at Ayapakkam Panchayat - VPR - R135 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,015.2 | sqm | 6 ₹6,091 | 8 ₹8,122 |
| 3.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal | |||||
| 4.00 | 0/0 - 1/00 | 6.28 | Cum | 4,409.5 ₹27,692 | 4,415 ₹27,726 |
| 5.00 | 1/00 -1/410 | 5.88 | Cum | 4,417 ₹25,972 | 4,428 ₹26,037 |
| 6.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 7,050 | Sqm | 34 ₹2.4 L | 36 ₹2.5 L |
| 7.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 | 176.25 | Cum | 11,805.5 ₹20.8 L | 11,820 ₹20.8 L |
| 8.00Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content | |||||
| 9.00 | 0/0 - 1/00 | 60 | Cum | 751.8 ₹45,108 | 753 ₹45,180 |
| 10.00 | 1/00 -1/410 | 24.6 | Cum | 761.5 ₹18,733 | 764 ₹18,794 |
Tender Value
₹30.9 L
EMD Value
₹77,375
Closing Date
13 Feb 2026, 3:00 pmClosed
Block Development Officer
Block Development Office VKM at Ambathur
Renewal BT Road to TNHB Kamarajar Road from plot No.6259 to 6333,6062 to 6228 5899 to 6040 at Ayapakkam Panchayat - VPR - R135
2026_RDTN_651986_1
RRMS 2025-26
Open Tender
Civil Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹77,375
Yes
14 Mar 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Renewal BT Road to TNHB Kamarajar Road from plot No.6259 to 6333,6062 to 6228 5899 to 6040 at Ayapakkam Panchayat - VPR - R135
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Provision for KM Stone
Provision for HM Stone
Provision for Equilqteral Triangle Cautionary Sign Board
Road Marker /Road stud with lens Reflector
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_781802.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
document.pdf
Tender Documents • 0.75 MB
BOQ_781802.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid