Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st Lowest₹8.1 LAccepted-Finance 172 1 SASHTRI NARENDRA NATH GANGULLY ROAD SHIBPUR HOWRAH 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | ₹8.1 L | 1st Lowest | Accepted-Finance 1st Lowest |
| 2 | 2nd Lowest₹8.4 L+₹32,547.47 (4.03%)Rejected-Finance 337 C INDIRA GANDHI ROAD KONNAGAR HOOGHLY 712235 | KONNAGAR | HOOGHLY | WEST BENGAL | 712235 | ₹8.4 L+₹32,547.47 (4.03%) | 2nd Lowest | Rejected-Finance 2nd Lowest |
| 3 | 3rd Lowest₹8.4 L+₹33,852.63 (4.19%)Rejected-Finance 22 2 R BELGACHIA HOWRAH | HOWRAH | HOWRAH | WEST BENGAL | ₹8.4 L+₹33,852.63 (4.19%) | 3rd Lowest | Rejected-Finance 3rd Lowest |
Tender Value
₹8.2 L
EMD Value
₹16,400
Closing Date
7 Aug 2026, 2:00 pmClosed
Assistant Engineer,RWS Howrah Sub-Division,PHE Dte
Salap School Bortala, Domjur, Howrah -711409.
Dismantling of OHR (Capacity 125000 Gallons or 473125 Ltr.) at Head work Site of Udaynarayanpur Zone-1, 2 Water Supply Scheme within Udaynarayanpur Block under Howrah Division, P.H.E. Dte.
2026_PHED_1032876_1
WBPHED/AE/RWS/NIeT-01 OF 2026-27
Open Tender
CIVIL WORKS
Fixed-rate
45 days
SALAP
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,400
10 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
7 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hire and labour charges for 100mm dia bamboo railing on 150mm dia Jhau/Eucalyptus or other approved timber 1.4 m above G.L. and 0.60 m below G.L. including tying strongly with coir ropes and boring holes for posts in any soil /black top/concrete surface, packing the sides etc. including cost of carriage of all materials and labour complete and maintaining barricading for a period beyond 5(five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in-Charge, including restoration to the damages of the ground to its original condition as per direction of Engineer-in -Charge after removing the barricade. [Cost of restoration will be paid separately.]
100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart. (i) Railing with 4 rows. | 160 | Mtr | 105 | ₹16,800 |
| 2 | Making lighting arrangement for continuation work during night including all charges (Applicable exclusively for emergency situation and as per direction of EIC.) | 120 | Hour | 182 | ₹21,840 |
| 3 | Hire & labour charges for staging and scaffolding made of strong and stout beamboo of salbullah propos with necessary cross bracing of bamboo/salbullah inlcuding that for unsupported horizontal projections outside lowering beam with necessary fixtures, making proper platforms/ stairs with wooden, planks etc. for the entire construction work and to maintain it till completion of work and removing the same as per direction and instruction of E.I.C. (Mode of measurement area of unsupported horizontal projection where staging beyond 4mtr. is practically unavoidable x mean height of staging above initial 4 mtr.) circle of diameter (centre to centre walkway of bottom ring beam) in shell wall of the reservoir minus the area of hallow for shaft outside to outside of outer bottom ring beam which ever is applicable as effective area and height of cenrte line level of conical portion of the reservoir beyond initial staging of 4 mtr. as height). | 2,700 | Cum | 155 | ₹4,18,500 |
| 4 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof. (Upto 4.00 Mtr.) | 36 | Cum | 1,956 | ₹70,416 |
| 4.1 | (b) 4.00 Mtr. to 8.00 Mtr. | 21 | Cum | 2,006 | ₹42,126 |
| 4.2 | (c) 8.00 Mtr. to 12.00 Mtr. | 21 | Cum | 2,056 | ₹43,176 |
| 4.3 | (d) 12.00 to 16.00 Mtr. | 21 | Cum | 2,106 | ₹44,226 |
| 4.4 | (e) 16.00 to 20.00 Mtr. | 34 | Cum | 2,156 | ₹73,304 |
| 4.5 | (f) 20.00 to 24.00 Mtr. | 68 | Cum | 2,206 | ₹1,50,008 |
| 4.6 | (g) 24.00 to Rest | 37 | Cum | 2,256 | ₹83,472 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
TermsandConditions.pdf
Tender Documents • 0.41 MB
BOQ_2536691.xls
BOQ • 0.32 MB
ImportantDocuments.pdf
Tender Documents • 0.15 MB
WBF2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .