Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-AOC NO 1 80 1ST FLOOR CHELLAMMAL PANDIYAN ILLAM 3RD STREET SATHYAVATHY NAGAR PADI NEAR BSNL CHENNAI 600044 | CHENGALPATTU | TAMIL NADU | 600044 | ₹4.8 Cr Quoted ₹5.0 Cr | L1 | Accepted-AOC L1- Lowest Value |
| 2 | L2₹5.4 Cr+₹46.4 L (9.33%)Rejected-AOC | ₹5.4 Cr+₹46.4 L (9.33%) | L2 | Rejected-AOC L2- Highest Value |
| Sl No | Description | Qty | Unit | Aiga Engineers Pvt Ltd L1 | HITECH LIFT MOVERS INDIA P LTD L2 |
|---|---|---|---|---|---|
| 1.00Replacement of damaged pipelines and Pump sets Under CWSS to 227 habitations in Andimadam Union, 13 Habitations in Jeyankondam union and 10 Habitations in Thirumanur union of Ariyalur District Revamping works 2025-26 (Period of Construction: 6 months & Free Maintenance: 3 Months). | |||||
| 1.01 | Replacement of Damaged Pipe lines 63mm to 250mm HDPE Pipes, 600mm MS Pipe including earth work, refilling, supply and laying with valves | 1 | No | 2,50,81,251.6 ₹2,50,81,251.6 Lowest | 2,74,38,795.56 ₹2,74,38,795.56 |
| 1.02 | Replacement of Pump set at Head works, Booster Sump and Group sumps | 1 | No | 1,24,46,723.9 ₹1,24,46,723.9 Lowest | 1,35,47,263.8 ₹1,35,47,263.8 |
| 1.03 | Replacement of Pump set at Head works, Booster Sump and Group sumps | 1 | No | 38,00,826.73 ₹38,00,826.73 Lowest | 41,88,099.28 ₹41,88,099.28 |
| 1.04 | Painting of Head works, Booster sumps, Group sumps and Pump Rooms | 1 | No | 7,85,461.13 ₹7,85,461.13 Lowest | 8,68,518.19 ₹8,68,518.19 |
| 2.00 | Sub Total | 1 | no | 4,21,14,263.36 ₹4,21,14,263.36 Lowest | 4,60,42,676.83 ₹4,60,42,676.83 |
| 3.00 | GST in 18% | 1 | GST | 75,80,567.4 ₹75,80,567.4 Lowest | 82,87,681.83 ₹82,87,681.83 |
Tender Value
₹4.8 Cr
EMD Value
₹3.6 L
Closing Date
4 Jul 2025, 3:00 pmClosed
CHIEF ENGINEER, TWAD BORD, THANJAVUR
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
Replacement of damaged pipelines and Pump sets Under CWSS to 227 habitations in Andimadam Union, 13 Habitations in Jeyankondam union and 10 Habitations in Thirumanur union of Ariyalur District Revamping works 2025-26
2025_TWAD_573927_1
05 /F.Revamping CWSS/ SDO/CE-TNJ/2025
Open Tender
Civil Works
Turn-key
180 days
TWAD BOARD, CHIEF ENGINEER
as per bid document
3 documents required · 3 mandatory
₹0
₹3.6 L
CHIEF ENGINEER, TWAD BOARD, THANJAVUR
25 Sept 2025
27 Jun 2025
7 Jul 2025
27 Jun 2025
4 Jul 2025
28 Jun 2025
27 Jun 2025
Amount
Replacement of damaged pipelines and Pump sets Under CWSS to 227 habitations in Andimadam Union, 13 Habitations in Jeyankondam union and 10 Habitations in Thirumanur union of Ariyalur District Revamping works 2025-26 (Period of Construction: 6 months & Free Maintenance: 3 Months).
Replacement of Damaged Pipe lines 63mm to 250mm HDPE Pipes, 600mm MS Pipe including earth work, refilling, supply and laying with valves
Replacement of Pump set at Head works, Booster Sump and Group sumps
Replacement of Pump set at Head works, Booster Sump and Group sumps
Painting of Head works, Booster sumps, Group sumps and Pump Rooms
Sub Total
GST in 18%
HITECH LIFT MOVERS INDIA P LTD (BID ID -1388479)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .