Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Fee/PreQual/Technical/Finance | -37.27% | ₹9.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹10.1 L+₹72,880.35 (7.78%)Admitted-Fee/PreQual/Technical/Finance | -32.39% | ₹10.1 L+₹72,880.35 (7.78%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹10.2 L+₹84,678.60 (9.04%)Admitted-Fee/PreQual/Technical/Finance | -31.60% | ₹10.2 L+₹84,678.60 (9.04%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹10.6 L+₹1.2 L (12.8%)Admitted-Fee/PreQual/Technical/Finance | -29.25% | ₹10.6 L+₹1.2 L (12.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹11.6 L+₹2.2 L (23.5%)Admitted-Fee/PreQual/Technical/Finance | -22.52% | ₹11.6 L+₹2.2 L (23.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹17.6 L
EMD Value
₹35,260
Closing Date
24 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER PWD DIVISION BENESHWAR DHAM
EXECUTIVE ENGINEER PWD DIVISION BENESHWAR DHAM HQ ASPUR
Reconstruction of Damage CD Work on Nithauwa to Sonarmata Bridge Ch. 2/100
2026_CEPWD_589129_5
NIT08/2026-2027 EE PWD DN BANESHWAR
Open Tender
Civil Works
Percentage
90 days
BENESHWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
AS PER NIT
₹35,260
Yes
31 Aug 2026
16 Aug 2026
25 Aug 2026
16 Aug 2026
24 Aug 2026
16 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CD Work
Earthwork in excavation for structures as per drawing and MoRTH specifications Clause304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m,dressing of sides and bottom and backfilling in trenches with excavated suitable material.
I. ordinary Soil
(i) Upto 3 m depth | 352.5 | Cum | 137 | ₹48,292.5 |
| 2 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104.
P.C.C grade M 10.
Nominal mix 1:3:6
For All Rajastha | 63.3 | Cum | 2,584 | ₹1,63,567.2 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104.
P.C.C. grade
M 20.Nominal mix (1:2:4)
For All Rajasthan | 227.03 | Cum | 2,927 | ₹6,64,516.81 |
| 4 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row.Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.
1000 mm dia | 30 | Mtr | 3,864 | ₹1,15,920 |
| 6 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using Fixed Form Paver and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). | 37.13 | Cum | 5,160 | ₹1,91,590.8 |
| 8 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications
Clauses 1009,1600 and 2302 | 2.81 | MT | 80,077 | ₹2,25,016.37 |
| 9 | Backfilling behind abutment, wing wall and return wall complete as per drawings & MoRTH specification Clause 304.3.7 & 2204.6
Granular material | 198 | Cum | 427 | ₹84,546 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.60 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 12.59 MB
BOQ_1046151.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .