Tender Value
₹5.3 L
EMD Value
₹7,000
Closing Date
26 Aug 2022, 2:00 pmClosed
SE EDC Etah
Vidhyut Colony, Aruna Nagar, Railway Raod, Etah.
Electrification of Village Nagla Tulai on Semi Turnkey basis under EDD Ist Etah in deposit scheme (Vidhyak Nidhi)
2022_DVVNL_721964_1
52/2022-23/EDC ETAH
Open Tender
Electrical Works
Turn-key
District-Etah
As per Tender Documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹7,000
30 Aug 2022
18 Aug 2022
26 Aug 2022
18 Aug 2022
26 Aug 2022
18 Aug 2022
Amount
Supply of 11 KV/LT Line Material as per relevant ISS
Stone Pad 3x300x75 mm
Danger Board with calmp
T-Off Chanell with clamp
F-Clamp with N&B
ST Pole 11 Mtr.
ABC Cable 3x95 Sq mm.
LT Distribution Box S/P
Clamp with N&B
63 KVA TF
11 KV Fuse Set
Erection Work
Safe carriage of 8.5 mtr. PCC Pole from Store Center Etah/Nearest 33/11 KV S/S to distance pit site in distance range 0 to 60 Km., including loading and unloading at both side.
Safe carriage of line material from Store Center Etah/Nearest 33/11 KV S/S to distance pit site in distance range 0 to 60 Km., including loading and unloading at both side.
Erection of 8.5 Mtr. Long PCC Pole as single support including, fixing of all HT/LT assoceries etc. complete pole should be grouted properly as per DVVNL /RESPO norms.
Erection of 11 Mtr. Long ST Pole as single support including, fixing of all HT/LT assoceries etc. complete pole should be grouted properly as per DVVNL /RESPO norms.
Erection of 8.5 Mtr. Long PCC Double Pole with grouting with cement sand and brick blast in ratio 1:4:8 including and fixing of all assoceries, erection of TPMO etc complete.
Laying sagging, stringing, binding and jumpering etc of ACSR Weasel Conductor as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc required for proper completion of work.
Laying, sagging, stringing, binding and jumpering etc. of 11 KV AB Cable for size 3x95 sq. mm. as per RESPO norms.
Mounting of 63KVA TF as double pole of PCC Pole supports including connection with LT line etc. complete.
LT Distribution Box S/P
11 KV Fuse Set
Stay complete
Earthing Complete
Stone Pad 3x300x75 mm
Danger Board with calmp
CHAUHAN ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .