Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹7.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.4 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹7.4 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹7.4 CrRejected-Finance CHIRA GHORAWAL SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹7.4 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹7.4 CrRejected-Finance N 1 PARSAKHEDA BAREILLY NEW ADDRESS 163 SUBHASH NAGAR BAREILLY UTTAR PRADESH PIN CODE 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹7.4 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹7.4 CrRejected-Finance A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | ₹7.4 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | MS ROAD LINES INDIA PVT LTD L4 | BHAMAR SINGH L2 | gopi constech pvt. ltd. L5 | ASHOK KUMAR L3 | M/S AJAY KUMAR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20cm layer including ramming & dressing the surface to the required levels & slope i/c 1.50 meter lift & 30 meter lead. The earth from cutting to be used in making embanment or to be deposited as spoil bank within 30 meter distance, dressing and disposal including laying in proper position with loading, unloading and carriage i/c cost of material, labour,T&P etc all taxes complete as per directed by engineer incharge. | 418 | Cum. | 64.76 ₹27,069.68 | 64.4 ₹26,919.20 | 64.91 ₹27,132.38 | 64.58 ₹26,994.44 | 50 ₹20,900 |
| 2.00 | Supplying , filling of HDPE woven bags Confirming to BIS No. 11652-2014 of cement bags size with local earth / RBM / Local Sand in nylon crate sewing & placing in proper position with loading, unloading and carriage i/c cost of material, labour,royalty, T&P etc complete as per directed by engineer incharge. | 4,97,148 | Nos. | 26.9 ₹1.3 Cr | 26.75 ₹1.3 Cr | 26.95 ₹1.3 Cr | 26.82 ₹1.3 Cr | 25 ₹1.2 Cr |
| 3.00 | Collection of silt / Sand from river bed at river bank by mud pump includind stacking & laying Levelling, dressing in proper position at site i/c cost of material, Labour, T&P etc complete for proper completion of work as per directed by engineer incharge | 4,108 | Cum. | 98.95 ₹4.1 L | 98.4 ₹4.0 L | 99.17 ₹4.1 L | 98.67 ₹4.1 L | 97.85 ₹4.0 L |
| 4.00 | Supplying, filling split/cut stone 20kg to 40 kg laying & packing of S.W.G.G.I.wire 8 gauge double knotted spacing 15 x 15 cm wire crate 1.50 x 1.50 x 0.50 meter in size & packing 20kg to 40 kg boulder size i/c tying of wire crates & laying in proper position i/c cost of material, labour, royalty, T&P etc including all taxes complete as per directed by engineer incharge. | 11,688 | Cum. | 4,459.54 ₹5.2 Cr | 4,434.75 ₹5.2 Cr | 4,469.46 ₹5.2 Cr | 4,447.15 ₹5.2 Cr | 4,409.96 ₹5.2 Cr |
| 5.00 | Supplying & Laying GEO Textile sheet bleow slope pitching made of 200 gsm woven multifilament polypropylene yarn including cost of material labour,T&P etc including all taxes complete as per directed by engineer incharge. | 3,322 | Sqm. | 103.44 ₹3.4 L | 102.87 ₹3.4 L | 103.67 ₹3.4 L | 103.16 ₹3.4 L | 102.29 ₹3.4 L |
| 6.00 | Supplying laying, Packing & pitching 20kg to 40 kg split /cut stone in Bank Slope i/c loading unloading & stacking cost of material, carriage, labour, royalty, T&P etc complete as per directed by engineer incharge. | 2,271 | Cum. | 3,411.62 ₹77.5 L | 3,392.66 ₹77.0 L | 3,419.21 ₹77.7 L | 3,402.14 ₹77.3 L | 3,373.7 ₹76.6 L |
| 7.00 | Laying & pitching of stone boulder, split/cut stone without crate including hand packing with lead of 60 meters and lift of 1.50 meter by head load i/c cost of material, carriage, labour, royalty, T&P etc complete as per directed by engineer incharge. | 196 | Cum. | 310.33 ₹60,824.68 | 308.6 ₹60,485.60 | 311.02 ₹60,959.92 | 309.47 ₹60,656.12 | 306.88 ₹60,148.48 |
| 8.00 | Providing & Laying bricks (M-150) on edge pitching (kharanja) in sand including preparation of sub grade & filling joints with local sannd i/c cost of material ,labour, T&P etc. required for proper completion of work as per directed by engineer incharge. | 434 | Sqm. | 445.25 ₹1.9 L | 442.78 ₹1.9 L | 446.24 ₹1.9 L | 444.02 ₹1.9 L | 440.3 ₹1.9 L |
| 9.00 | Dismentling stone work includind stacking in proper position at site i/c cost of material, Labour, T&P etc complete for proper completion of work as per directed by engineer incharge. | 246 | Cum. | 110.64 ₹27,217.44 | 110.02 ₹27,064.92 | 110.88 ₹27,276.48 | 110.33 ₹27,141.18 | 109.41 ₹26,914.86 |
Tender Value
₹8.3 Cr
EMD Value
₹16.5 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2026_UPIDC_1123087_1
08/SE/2025-26
Open Tender
Civil Works
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹16.5 L
Office of SE GNSM Meerut
7 Apr 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
11 Mar 2026
Earth Work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits and earth work in embankment to be in 20cm layer including ramming & dressing the surface to the required levels & slope i/c 1.50 meter lift & 30 meter lead. The earth from cutting to be used in making embanment or to be deposited as spoil bank within 30 meter distance, dressing and disposal including laying in proper position with loading, unloading and carriage i/c cost of material, labour,T&P etc all taxes complete as per directed by engineer incharge.
Supplying , filling of HDPE woven bags Confirming to BIS No. 11652-2014 of cement bags size with local earth / RBM / Local Sand in nylon crate sewing & placing in proper position with loading, unloading and carriage i/c cost of material, labour,royalty, T&P etc complete as per directed by engineer incharge.
Collection of silt / Sand from river bed at river bank by mud pump includind stacking & laying Levelling, dressing in proper position at site i/c cost of material, Labour, T&P etc complete for proper completion of work as per directed by engineer incharge
Supplying, filling split/cut stone 20kg to 40 kg laying & packing of S.W.G.G.I.wire 8 gauge double knotted spacing 15 x 15 cm wire crate 1.50 x 1.50 x 0.50 meter in size & packing 20kg to 40 kg boulder size i/c tying of wire crates & laying in proper position i/c cost of material, labour, royalty, T&P etc including all taxes complete as per directed by engineer incharge.
Supplying & Laying GEO Textile sheet bleow slope pitching made of 200 gsm woven multifilament polypropylene yarn including cost of material labour,T&P etc including all taxes complete as per directed by engineer incharge.
Supplying laying, Packing & pitching 20kg to 40 kg split /cut stone in Bank Slope i/c loading unloading & stacking cost of material, carriage, labour, royalty, T&P etc complete as per directed by engineer incharge.
Laying & pitching of stone boulder, split/cut stone without crate including hand packing with lead of 60 meters and lift of 1.50 meter by head load i/c cost of material, carriage, labour, royalty, T&P etc complete as per directed by engineer incharge.
Providing & Laying bricks (M-150) on edge pitching (kharanja) in sand including preparation of sub grade & filling joints with local sannd i/c cost of material ,labour, T&P etc. required for proper completion of work as per directed by engineer incharge.
Dismentling stone work includind stacking in proper position at site i/c cost of material, Labour, T&P etc complete for proper completion of work as per directed by engineer incharge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2091906.pdf
techsummary_2091906.pdf
finance_2091906.pdf
BOQ Comparative Chart
xlsx
finsummary_2091906.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
BOQ_2091906.xls
BOQ • 0.24 MB
TDLOT1.pdf
Tender Documents • 1.56 MB
Download all tender documents and submit your bid