| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹83.2 LAdmitted-Finance | -47.00% | ₹83.2 L | L1 | Admitted-Finance |
| 2 | L2₹86.4 L+₹3.1 L (3.77%)Admitted-Finance 0 0 PIPRAICH GORAKHPUR GORAKHPUR UTTAR PRADESH 273152 | GORAKHPUR | UTTAR PRADESH | 273152 | -45.00% | ₹86.4 L+₹3.1 L (3.77%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹40.4 L (48.6%)Admitted-Finance | -21.24% | ₹1.2 Cr+₹40.4 L (48.6%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹50.6 L (60.8%)Admitted-Finance LAXMI NAGAR LATUR TQ DIST LATUR | LATUR | LATUR | MAHARASHTRA | -14.75% | ₹1.3 Cr+₹50.6 L (60.8%) | L4 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
27 Apr 2026, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer National Highway Division, Latur New Bandhkam Bhavan, Third Floor, Near Shaskiya Sankraman Nivassthan, Old Ausa Road, Latur- 413512
Short Term Maintenance Contract STMC to 1.Section of Ganjur to Ashtamodein km.132.800 to 133.800 NH.63 2. Overlay to Udgir ROB. Service road in km.179.500 to 180.300 NH.63 3.Gharola to Gharni in km.102.700 to 104.700 NH.752K in State of Maharashtra
2026_MoRTH_905770_1
EENHDLaturTender-1STMC/720
Open Tender
Civil Works
Item Rate
365 days
Latur
As per tender documents
4 documents required · 4 mandatory
₹5,000
Yes
EE NHD Latur
₹1.6 L
Yes
3 Sept 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1NH-63(section Overlay toUdgir ROB with service roadin km 179/500 to 180/300 Length=0.80 Km | |||||
| 1.01 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader/Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401--By Mix in Place Method and Grading - II Material | - | Cum | - | - |
| 1.02 | Prime coat-Providing and applying primer coat with bitumenemulsionon prepared surface of granular Baseincludingc leaning of road surface and spraying, prime rattherate of 0.60Kilogram/Square Metre using mechanical means.Tate as Per SSR 2022-23 | - | Sqm | - | - |
| 1.03 | DENSE BITUMINOUS MACADAM:--Providing and laying dense bituminous macadam using crushed aggregate of grading 1, premixed with bituminous binder Bitumen of specified grade,@ 4.50 % by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 76/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27-2009 specified conditions and attachments such as electronic load sensor based belt conveyers, automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver, and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen VG-30 grade with stone dust filler (VG-40 bulk bitumen rates are considered to arrive at rates) | - | Cum | - | - |
| 1.04 | Providing and laying Bituminous Concrete using crushed aggregates of grading 2, premixed with bituminous binder @ 5.40 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 30 mm compacted thickness with VG-40 Bitumen,Excluding prime / tack coat. For Bitumen VG-40 bulk -- USING 80 TPH Batch mix type hot mix plant , Sensor Paver, Intelligent Compactor with compaction analyzer and V-Sat attachment with Stone Dust filler | - | Cum | - | - |
| 1.05 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG-30 bulk bitumen. Spec. | - | Sqm | - | - |
| 1.06 | Providing, Laying, Spreading and compacting hardmurum having PI < 6 in including spreading in uniform layers on a prepared Surface & compacting with Static roller having weight 8 to 10 MT including necassary artificial watering, all materials, labour, machinery, guarding, barricating complete with all leads & lifts of all materials etc. complete | - | cum | - | - |
| 1.07 | BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-40 bulk bitumen) (Including Tack Coat) SOR 2022-23 | - | Cum | - | - |
| 1.08 | White washing two coats on parapet walls and white washing and geru lime painting to tree trunks including preparation of surface by cleaning scraping etc. complete | - | Sqm | - | - |
| 1.09 | Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specified shade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be > 250 mcd/sqm/lux measured in the initial 7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of 2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free from streaks and holes complete as per direction of Engineer-in-charge and in accordance with applicable specifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015). | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
pfppdf.pdf
Tender Documents • 2.78 MB
Bharatkosh.pdf
Tender Documents • 0.39 MB
BOQ_952064.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .