Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹4.0 L+₹10,228.06 (2.62%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Not Admitted-Fee/PreQual/Technical SHOP NO 55 GROUND FLOOR ROHINI SECTOR 7 NAHARPUR FLOOR HARLAL MARKET NAHARPUR SECTOR 7 DELHI OPP GOYAL GARMENTS VILLAGE TOWN DELHI CITY DELHI | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
29 Sept 2020, 11:15 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (EnM) WnS (WEST)
C-2A Block Janakpuri BPS New Delhi-110058.
Servicing/Overhauling and Dehydration of 1600 KVA Transformer No. 1 installed at Punjabi Bagh B.P.Station (HT Plant).
2020_DJB_194800_18
e-NIT No.12 / EnM (WEST)/ 2020-21
Open Tender
Miscellaneous Works
Works
30 days
C-2A Block Janakpuri BPS New Delhi
Please refer Tender Documents.
3 documents required · 3 mandatory
₹500
Yes
DJB Account No. 50448339804
₹7,900
Yes
9 Oct 2020
21 Sept 2020
29 Sept 2020
21 Sept 2020
29 Sept 2020
21 Sept 2020
120 days
Servicing/Overhauling & Dehydration of 1600 KVA Bharat Bijlee Make Transformer No. 1 installed at Punjabi Bagh B.P.Station (HT Plant) by carring out following works. Dismantling of the complete transformer, disconnection of incoming HT cable connection in all respect.
Heating the HT & LT winding with inductance heating, removing the moisture to improve the IR value of the HT & LT winding.
Topping-up of transformer oil in T/R as required.
Dehydration of complete transformer oil.
Replacement of salica jal.
Checking and testing the transformer winding with HI POT testing, IR value, voltage Ratio etc.
Replacement of transformer cooling fins gasket & nut -bolts for stopping the leakage &repairing of fins.
Complete servicing of the bus duct and re-insulation of bus duct with epox paint including tightening of all the nut-bolts and joint etc. Replacing broken/defective insulator support as per site requirement. Reinstallation of the bus duct finishing all the jobs including making connection/joint through nut-bolt at both ends i.e the transformer as per site requirement.
Assembling the complete transformer by reconnection of all incoming & outgoing cable commissioning and testing on full load.
Painting the complete transformer by synthetic enamel paint after removing of deposited oil & dust by chemical washing from all around the body.
A.S.ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .