Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-AOC | ₹3.8 L | 1 | Accepted-AOC L1-AOC Awarded |
| 2 | 2₹3.8 LRejected-Finance | ₹3.8 L | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | MILESTONE DEVELOPERS L1 | SETHUPATHI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Dismantling Plain Cement Concrete | 31 | 1M3 | 520 ₹16,120 | 520.2 ₹16,126.20 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 17 | 1M3 | 165 ₹2,805 | 165 ₹2,805 |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 9 | 1M3 | 5,488 ₹49,392 | 5,488 ₹49,392 |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 115 | 1M2 | 686 ₹78,890 | 686.8 ₹78,982 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Parts of crushed stone M-sand and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 and aiso as per IS 456-2007) | 24 | 1M3 | 6,600 ₹1.6 L | 6,662.8 ₹1.6 L |
| 6.00 | Suppply and delivery of 600mm dia RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints. | 5 | 1M | 3,166 ₹15,830 | 3,166.4 ₹15,832 |
| 7.00 | Lowering of 600mm dia RCC pipes and specials into the trenches and laying to proper grade and alignment includes all labour charges etc complete | 5 | 1M | 194 ₹970 | 194 ₹970 |
| 8.00 | Jointing of 600mm dia RCC pipes with cement using necessary collars including the cost of jointing materials. includes all labour charges etc complete | 2 | 1M | 978 ₹1,956 | 978 ₹1,956 |
| 9.00 | Gst - 18% | 1 | 1No | 58,385.34 ₹58,385.34 | 58,674.67 ₹58,674.67 |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
18 Nov 2025, 3:00 pmClosed
COMMISSIONER
NO 01 , TRICHY ROAD , PALLADAM
GENERAL FUND - Construction of SWD and culvert at bharathipuram road near MC mandapam in ward nO-10 in Palladam municipality
2025_MAWS_623453_1
3096/2025/E1
Open Tender
Civil Works
30 days
PALLADAM MUNICIPALITY LIMIT
REFER TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹3,900
23 Mar 2026
14 Nov 2025
18 Nov 2025
14 Nov 2025
18 Nov 2025
14 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_745558.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid