Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-AOC 213 SRI KRISHNA NAGAR BRAHMRSI CHOWK AURANGABAD SRI KRISHNA NAGAR AURANGABAD BIHAR 824101 | AURANGABAD | BIHAR | 824101 | 1 | Accepted-AOC Accepted as L1 bidder and awarded value is including GST. | |
| 2 | Rejected-Technical | - | Rejected-Technical Documents was not checked as bidder was L5. | |
| 3 | Rejected-Technical | - | Rejected-Technical Documents was not checked as bidder was L3. | |
| 4 | Rejected-Technical AT 246 NIRSA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | - | Rejected-Technical Documents was not checked as bidder was L2. | |
| 5 | Rejected-Technical CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Documents was not checked as bidder was L4. |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
15 Apr 2023, 12:00 pmClosed
General Manager (Operation)
Office of General Manager, Jamuna Kotma Area, Kotma, Anuppur, MP, 484444
Transportation/Shifting of 03 LHDs, 01 UDMs and 01 HPP with roof bolter along with machineries and electrical equipments in P-2 panel in L.K.II Seam of Bhadra 7/8 Mine, Bhadra Sub Area, Jamuna Kotma Area.
2023_SECL_276768_1
SECL/JK/GM(O)/22-23/eT/58 Dt. 30.03.2023
Open Tender
Miscellaneous Works
Item Rate
90 days
Bhadra 7/8 Mine, Bhadra Sub Area, JK Area
AS PER NIT
3 documents required · 3 mandatory
₹5,200
23 May 2023
30 Mar 2023
17 Apr 2023
30 Mar 2023
15 Apr 2023
31 Mar 2023
31 Mar 2023 - 4 Apr 2023
Amount
Shifting of 03 No. LHD
Shifting of 01 No. of UDM
Shifting of Auxiliary fan with motor by 150 Mtr
Shifting of 01 No. of HPP with motor by 150 Mtr
Shifting of TSU, VCB, Main Switch, lighting transformer with 530 Mtr power cable by 150 Mtr
Shifting of 05 No. main switches with (100+6)X4=530 M power cable from switch to GEB and main power cable by 150 Mtr
Shifting of panel switch, one lighting transformer, shifting of power cable by 150 Mtr
Shifting of face pump, suction pipe, delivery pipe, foot valve by 60 Mtr
Dismantling & Transportation of belt conveyor with complete structure by 280 Mtr (The work also includes the final dismantling of two driveheads and transportation of old & rejected conveyor belts from depillaring panel P-1 to surface.)
Total impact of GST for the purpose of CTC
MANOJ KUMAR SINGH
MAHENDRA SINGH
Ram Awadh Singh
KUTBUDDIN ANSARI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .