Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC BHATJANGI LA P S KOTWALI NADIA | NADIA | WEST BENGAL | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹15,772.47 (1.05%)Rejected-Finance KALIKA DAS NATUN BAZAR COOCH BEHAR 736101 W B | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L2 | Rejected-Finance Rejected | |
| 3 | L2₹15.2 L+₹15,772.47 (1.05%)Rejected-Finance N N ROAD RAIL GHUMTI WARD NO 09 P O DIST COOCH BEHAR 736101 | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | L2 | Rejected-Finance Rejected |
Tender Value
₹15.0 L
EMD Value
₹30,043
Closing Date
4 Dec 2025, 6:00 pmClosed
ADDITIONAL EXECUTIVE OFFICER
COOCH BEHAR ZILLA PARISHAD
CONSTRUCTION OF PUCCA DRAIN FROM AKTER SHOP HOUSE TO GOLAER DOLLA UNDER JHAUKUTHI WITHIN TUFANGANJ-I PS IN THE DISTRICT COOCH BEHAR.
2025_ZPHD_945556_3
WBZP/16/DE-ET/COB/2025-26(2nd Call)
Open Tender
CIVIL WORKS
Percentage
90 days
COOCH BEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹30,043
COOCH BEHAR ZILLA PARISHAD
18 May 2026
12 Nov 2025
8 Dec 2025
12 Nov 2025
4 Dec 2025
12 Nov 2025
17 Nov 2025
Earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil butexcluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming thesides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete.Depthof Excavation not exceeding 1.5 m
arth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
(I) Cement concrete with graded stone ballast (35 mm size excluding shuttering) (1:3:6) In ground floor
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out aftercompletion of works (upto roof of ground floor)
Plaster (to wall, floor, celling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding /staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface](Details in bill)With 1:4 cement morter,10 mm thick plaster
Providing weep holes in Brick masonry / Plain /Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending throughthe full width of the structure with slope of 1V:20Htowards drawing face. Complete as per drawingand Technical specifications.
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removalof looserust (ifnecessary), cutting to requisite length ,hooking ....of ground floor/upto 4 m (i) Tor steel/Mild Steel,II. Other than , SAIL/ TATA/RINL
Providing & fixing Concrete Sign Board as per IRC specification of size 900 x 750 x 37 mm. thick made with RCC 1:1½:3 with pakur variety stone chips reinforced with double layer IRC febric (75 x 75 mm. mesh) and fixed with ......(The rate is inclusive of cost of reinforcement, concrete, shuttering, nuts & bolts, washer etc. complete.)
Earth work in filling in foundation trenches or plinthwith good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layercomplete. (Payment to be made on the basis ofmeasurement of finished quantity of work)( c )With carried earth arrange by the contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_2246835.xls
BOQ • 0.34 MB
OID.pdf
Tender Documents • 0.06 MB
EMD.pdf
Additional Documents • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .