Loading…
Loading…
Tender Value
₹19.9 L
EMD Value
₹19,925
Closing Date
13 Jul 2026, 5:00 pm5d left
DPC Khordha
DPO Khordha
Construction of Intigrated Maths with Science Lab at Govt. High School, Salapdiha, Banapur
2026_OPEPA_133018_22
01/CW/SS/2026-27
Open Tender
Civil Works - Buildings
180 days
DPO Khordha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹19,925
Yes
29 Jun 2026
29 Jun 2026
14 Jul 2026
29 Jun 2026
13 Jul 2026
29 Jun 2026
29 Jun 2026 - 10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard Soil in foundation including intial lead and 1.5 m. intial lift including rough dressing etcincluding cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. | 66.87 | cum | 282.89 | ₹18,916.94 |
| 2 | Sand filling in foundation and plinth with approved river sand well watered and rammed.including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. | 79.01 | cum | 1,579.51 | ₹1,24,797.06 |
| 3 | Plain Cement Concrete (1:3:6) using 40 mm size H.G. metal ( crusser brocken ) well rammed including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. In Foundation | 8.98 | cum | 6,772.14 | ₹60,813.82 |
| 4 | Plain Cement Concrete (1:4:8) using 40 mm size H.G. metal ( crusser brocken ) well rammed including cost, conveyance, royalty taxes of all metarials, etc completed as per the direction of the Engineer-in-charge. | 9.32 | cum. | 6,397.31 | ₹59,622.93 |
| 5 | Flyash (10") brick work in cement mortar (1:6) using Flyash. bricks of approved quality including cost, conveyance & royalty of all metarials etc complete as per direction of the Engineer-in-charge. (a) Foundation | 10.15 | cum | 5,836.51 | ₹59,240.58 |
| 6 | (b) Super structure | 23.07 | cum | 5,874.84 | ₹1,35,532.56 |
| 7 | (c)FF | 5.32 | cum | 6,266.57 | ₹33,338.15 |
| 8 | R.C.C. work of M-20 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying.(a) Column Foundation & Plinth | 22.65 | cum. | 6,779.63 | ₹1,53,558.62 |
| 9 | (b) Lintel. Column, beam, chajja, slab | 24.74 | cum. | 6,779.63 | ₹1,67,728.05 |
| 10 | (c) Column(FF) | 0.89 | cum. | 6,904.46 | ₹6,144.97 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_598325.xls
BOQ • 0.33 MB
DTCN.pdf
Tender Documents • 2.65 MB
Download all tender documents and submit your bid