Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT KHURIGAM PO PS KASHINAGAR DIST GAJAPATI PIN 761206 | GAJAPATI | ODISHA | 761206 | Accepted-Technical Qualified as per Evaluation sheet |
| 2 | Accepted-Technical | Accepted-Technical Qualified as per Evaluation sheet |
| 3 | Accepted-Technical VILL PO KIDIGAM PS KASHINAGAR DIST GAJAPATI ODISHA PIN 761206 | KASHINAGAR | GAJAPATI | ODISHA | 761206 | Accepted-Technical Qualified as per Evaluation sheet |
| 4 | Accepted-Technical | Accepted-Technical Qualified as per Evaluation sheet |
| 5 | Accepted-Technical | Accepted-Technical Qualified as per Evaluation sheet |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
18 Sept 2026, 5:00 pmClosed
Circle Officer
R and B Circle Rayagada
Construction of Sub-Registrar Office (Type-II) for Tahasil Office at Kashinagar in the District of Gajapati Buildings.
2026_EICCL_140139_1
CCE RandB RGDA- 04/2026-27
Open Tender
Civil Works - Buildings
Percentage
210 days
Gajapati
2 documents required · 2 mandatory
₹10,000
₹2.1 L
Yes
12 Oct 2026
3 Sept 2026
19 Sept 2026
3 Sept 2026
18 Sept 2026
3 Sept 2026
3 Sept 2026 - 11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed and depositing the excavated materials away from the work site within initial lead & lifts etc. complete as directed by the Engineer in charge. | 760.55 | cum | 282.88 | ₹2,15,144.38 |
| 2 | Supplying and filling in foundation and plinth with sand, laying in layers, well watered and rammed including cost, conveyance, royalties and taxes of all materials, cost of all labour and T&P etc. complete in all respect as per direction by the Engineer in charge. | 1,003.55 | cum | 541.44 | ₹5,43,362.11 |
| 3 | Providing GSB Gr-vi materials, spreading in uniform layers with motor grader, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 401 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 44 | cum | 2,405.86 | ₹1,05,857.84 |
| 4 | Providing and laying PCC (1:3:6) in foundation and floors using 4cm size crushed stone granite aggregates including laying in layers, ramming, watering and curing etc. complete including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in -charge. | 163.52 | cum | 6,315.97 | ₹10,32,787.41 |
| 5 | PCC / RCC work of (1:1.5:3) in all floors using 12mm size crushed stone granite aggregates including laying in layers, ramming, watering and curing etc. complete including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in -charge. | 44.34 | cum | 8,765.46 | ₹3,88,660.5 |
| 6 | Fly ash brick masonry in all floors with cement mortar (1:6) using bricks of 25cm size, after immersing Bricks before use with watering, curing etc. complete including cost, conveyance, royalties, taxes of all materials, cost of all labour, all T&P etc. complete in all respect as directed by the Engineer-in-charge.
In Foundation | 78.12 | cum | 5,617.23 | ₹4,38,818.01 |
| 7 | Back Filling of surplus excavated earth at work site by initial lead and lift of 1.50mtr including cost of all labour T&P required for the work etc. complete as directed by Engineer-In-Charge | 760.33 | cum | 157.16 | ₹1,19,493.46 |
| 8 | R.C.C. work of M.25 in Foundation using 20 mm & down graded size crushed stone granite aggregates including hoisting lowering, laying concrete and compacting by using vibrators, watering, curing and necessary centring & shuttering for smoth finishing of work excluding steel reinforcement work including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in -charge.
In Foundation | 142.86 | cum | 7,243.11 | ₹10,34,750.69 |
| 9 | Plinth Band | 19.54 | cum | 8,117.53 | ₹1,58,616.54 |
| 10 | Column & Beam
Ground Floor | 21.05 | cum | 16,625.93 | ₹3,49,975.83 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.15 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_608100.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .