| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.7 LAccepted-AOC | ₹23.7 L | 1 | Accepted-AOC lesser the estimate value |
| 2 | 2₹24.1 LRejected-Finance DINDIGUL | DINDIGUL | DINDIGUL | TAMIL NADU | ₹24.1 L | 2 | Rejected-Finance above the estimate value |
| Sl No | Description | Qty | Unit | S AMALRAJ L2 | BMP CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00COLLECTION SYSTEM | |||||
| 2.00 | Labour charges for Cutting open BT roads and WBM roads for laying sewers etc complete and as directed by deparmental officers pg no. 315 | 13.2 | 1 m3 | 850 ₹11,220 | 840 ₹11,088 |
| 3.00Earthwork excavation and depositing on bankwith an initial lead of 10 m and initial lift of 2m in the following type of soils etc., complete.and as directed by Departmental officers In Hard stiff clay, stiff black cotton, hard red earth, shales, murrams, gravel, stoney earh and earthmixed with small size boulders and hard gravelly soil pg no. 307 | |||||
| 4.00 | Medium rock, and Dense Medium Rock not requiring Blasting etc., pg no. 307 | 59.4 | 1 m3 | 600.5 ₹35,669.70 | 586 ₹34,808.40 |
| 5.00 | Hard Rock pg no. 307 | 99 | 1 m3 | 1,535.5 ₹1.5 L | 1,523.5 ₹1.5 L |
| 6.00 | Barricading the trenches for one side using casuarina poles 8 to 10 cm dia , white PVC tape 15 mm wide with red strips printed in two rows, 75 mm dia red reflectors in every 3 m length providing two no. of danger lights for every 150m length, including the cost of all materials, charges for fixing of barricading and removal of barricading after testing and filling the trench and stacking the post for reuse etc complete as directed by the Departmental officers.(casuarina poles to be fixed at every 1.5m pg no. 339 | 50 | 1 m | 56 ₹2,800 | 54 ₹2,700 |
| 7.00 | Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0-3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0-7mts. and (vi) 0-8mts. pg no. 210 | 264 | 1Rm | 7,200 ₹19.0 L | 7,051.5 ₹18.6 L |
| 8.00 | Removing the burst R.C.C. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board Officers pg no. 181 | 22 | 1Rm | 5,795.45 ₹1.3 L | 5,789 ₹1.3 L |
| 9.00 | Supplying RCC 350MM NP3 Class non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints pg no. 55 | 23 | 1Rm | 1,865.2 ₹42,899.60 | 1,850 ₹42,550 |
| 10.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment pg no. 168 | 22 | 1Rm | 38 ₹836 | 37 ₹814 |
Tender Value
₹28.5 L
EMD Value
₹28,500
Closing Date
21 Jan 2026, 3:00 pmClosed
Commissioner, Dindigul City Municipal Corporation
9/13, Main road, Corporation Office, Dindigul
15th CFC Tied Grant 2025-2026-UGSS Laying of Trunk Sewer Main line Gtn Salai Main Road in Dindigul City Municipal Corporation
2026_MAWS_641808_13
001052/2025/E4
Open Tender
Civil Works
Dindigul City Municipal Corporation limits
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,500
24 Feb 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
Labour charges for Cutting open BT roads and WBM roads for laying sewers etc complete and as directed by deparmental officers pg no. 315
Earthwork excavation and depositing on bankwith an initial lead of 10 m and initial lift of 2m in the following type of soils etc., complete.and as directed by Departmental officers In Hard stiff clay, stiff black cotton, hard red earth, shales, murrams, gravel, stoney earh and earthmixed with small size boulders and hard gravelly soil pg no. 307
Medium rock, and Dense Medium Rock not requiring Blasting etc., pg no. 307
Hard Rock pg no. 307
Barricading the trenches for one side using casuarina poles 8 to 10 cm dia , white PVC tape 15 mm wide with red strips printed in two rows, 75 mm dia red reflectors in every 3 m length providing two no. of danger lights for every 150m length, including the cost of all materials, charges for fixing of barricading and removal of barricading after testing and filling the trench and stacking the post for reuse etc complete as directed by the Departmental officers.(casuarina poles to be fixed at every 1.5m pg no. 339
Shoring, and strutting with sheet piles of size width 400 mm x height of 3m x thickness of 9mm as per IS 2314-1986 by driving on both sides of the trench from Ground Level up to the required depth and connecting the above sheet piles by horizontal strutting with sheet piles at an interval of 1.0m, fixing the sheet piles by connecting the horizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50m interval and including removing the sheet piles after the pipelines are laid, jointed, tested, and stacking it safely for other uses. It includes the cost of sheet piles and casurina poles including labour charges for erecting the sheet piles, driving the sheet piles, removing the sheet piles, fixing Casurina poles, etc., complete and all other incidental charges for the depths (i) 0-3mts.,(ii) 0-4mts.,(iii) 0-5mts., (iv) 0-6mts.,(v) 0-7mts. and (vi) 0-8mts. pg no. 210
Removing the burst R.C.C. pipes from the pipe line and removal of slushy soil and baling out water and replacing the pipe line with sound pipe including jointing and cost of refilling the pipe line with water for retesting the pipe line etc., complete. (excluding cost of sound pipe and jointing materials and earth work) and as directed by the TWAD Board Officers pg no. 181
Supplying RCC 350MM NP3 Class non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints pg no. 55
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment pg no. 168
Jointing RCC pipes with cement using necessary collars including the cost of jointing materials pg no. 168
Plane cement concrete in 1:4:8 (one cement, four sand and eight coarse aggregate) using 40 mm hard broken stone including mixing concrete, laying curing and compacting of concrete etc., complete and as directed by Departmental officers.
Plane cement concrete in 1:2:4 (one cement, two sand and four coarse aggregate) t and 20 mm hard broken stone including mixing concrete, laying curing and compacting ofconcrete etc complete and as directed by Departmental officers.
Refilling the trenches with excavated soil (other than sand) complying with standard specification for filling the foundation including watering consolidation etc., complete as directed by the Departmental officers.pg no. 302
Hire charges for deploying earth moving machinery (JCB/Poclain) for earth work including diesel, oil, labour charges etc complete,for dismantling and pulling the demaged MS pipe pg no. 209
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_768997.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_768997.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid