Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance | -18.18% | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹9.0 L+₹7,296.21 (0.82%)Admitted-Finance | -17.51% | ₹9.0 L+₹7,296.21 (0.82%) | L2 | Admitted-Finance |
| 3 | L3₹9.1 L+₹15,028.01 (1.69%)Admitted-Finance | -16.80% | ₹9.1 L+₹15,028.01 (1.69%) | L3 | Admitted-Finance |
| 4 | L4₹10.8 L+₹1.8 L (20.7%)Admitted-Finance 00 BALIHAWAN DEH MAFI BALIHAWAN DEH MAFI KAUSHAMBI KAUSHAMBI UTTAR PRADESH 212202 | KAUSHAMBI | UTTAR PRADESH | 212202 | -1.22% | ₹10.8 L+₹1.8 L (20.7%) | L4 | Admitted-Finance |
| 5 | L5₹10.8 L+₹1.9 L (21.6%)Admitted-Finance | -0.54% | ₹10.8 L+₹1.9 L (21.6%) | L5 | Admitted-Finance |
Tender Value
₹10.9 L
EMD Value
₹1.1 L
Closing Date
21 Jul 2026, 3:00 pmClosed
EO
NAGAR PALIKA PARISHAD MUZAFFARNAGAR
Ward No. 18 Agrasain Vihar Park me Boundary ke sudhar ve Painting ka karye
2026_DOLBU_1164399_41
607/E-TENDER/PWD/NPP/2026-27 DT 27-06-2026
Open Tender
Civil Works
Percentage
45 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
EO
₹1.1 L
4 Aug 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
21 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Old and Damage Brick work including Stacking of Materials. (SI. No. 692) | 9.73 | cum | 400 | ₹3,892 |
| 2 | Dismantling Existing Plaster Including Disposal of Refuse as Directed by the Engineer-in-Charge Within a Distance of 60 Meter (200 Feet). (SI. No. 706) | 231.6 | sqm | 30 | ₹6,948 |
| 3 | Excavatin in foundation in ordinarry soiel.[SI.No.273] | 5.76 | cum | 90 | ₹518.4 |
| 4 | Laying Base Concrete in 1:6:12 c/fs/bb Mortar. (SI. No. 273) | 0.81 | cum | 2,985 | ₹2,417.85 |
| 5 | RCC work in 1:2:4 C/cs/sg For Column and Wall all complete (SI. No. 284) | 2.97 | cum | 6,900 | ₹20,493 |
| 6 | MS or Iron work such as reinforcement. | 2.33 | Qtl. | 7,818 | ₹18,215.94 |
| 7 | M&150 class Brick work in 1:4 mortar 1cement and 4 coars sand complete all work. [SI.No.305] | 7.73 | cum | 4,520 | ₹34,939.6 |
| 8 | 12mm thick Plaster in 1:4 c/fs mortar. [SI.No.584a] | 211.47 | sqm | 165 | ₹34,892.55 |
| 9 | Earth work in Filling with Ordinary Soil including Soil in Cluding cartage upto 8km [SI. No. 253+261+231a] | 557.03 | cum | 255.4 | ₹1,42,265.46 |
| 10 | Supply and Fixing fo Wall Tile all work complete with T&P etc. (SI. No. 628) Add 15% For Westage. | 219.4 | sqm | 900 | ₹1,97,460 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.28 MB
BOQ_2184056.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .