Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | L1 | Accepted-Finance L1 | |
| 2 | L2₹20.0 L+₹1.6 L (8.96%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
12 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
EDC, Ayodhya
Construction of Line and Installation of Different Capacity of Transformer in Jurisdiction of EDSD-Darshan Nagar, Bikapur and Gosiganj (Running Work) Deposit Scheme under Electricity Distribution Division-IInd, Ayodhya
2024_MVVNL_943056_1
56 H(F)(W)/2024-25
Open Tender
Electrical Works
Item Wise
180 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹20,000
24 Aug 2024
3 Aug 2024
13 Aug 2024
3 Aug 2024
12 Aug 2024
3 Aug 2024
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 60 Km.)
Safe cartage of 8.5/9.0 Mtr. Long PCC poles.
Safe cartage of 11.0 Mtr. Long ST poles.
ACSR Weasel Conductor
AB Cable (1x16+1x25) sqmm
AB Cable (3x50+1x35+1x16) sqmm
AB Cable (3x95+1x70+1x16) sqmm
Distribution Box Three Phase/Single Phase
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
11 KV Cable Jointing Kit Outdoor 3x70 sqmm
11 KV Cable Jointing Kit indoor 3x185 sqmm
11 KV XLPE Cable 3x70mm2
11 KV XLPE Cable 3x185mm2
11 KV Pilfer Proof Metring Cubical
Other Line material i.e. cross arm /conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of PCC/ST Pole as per RESPO Norms.
Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms
Stringing, Sagging, binding and jumpering of AB Cable Size (1x16+1x25)/ (3x50+1x35+1x16)/ (3x95+1x70+1x16) as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Mounting of 63 KVA Transformer as per RESSPO Norms.
Mounting of 100 KVA Transformer as per RESSPO Norms.
Erection & Commissioning of of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x70 mm2 Indoor XLPE Cable Box.
Installation and Fixing of 11 KV Cable Jointing Kit Outdoor 3x185 mm2 Indoor XLPE Cable Box.
Laying of underground 11 KV 3x70/3x185 sq mm by trunch XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Installation of 11 KV Pilfer Proof Metering Cubical
PRAGATI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .