Loading…
Loading…
Tender Value
₹6.7 L
EMD Value
₹16,554
Closing Date
28 Aug 2026, 9:30 pm5d left
Directorate of Municipal Administration
Riyaz Ahmed Hubballi
08362213838
9880509887
Open Drain work at ward no.01 near Hamapannavar Layout Kittur resd
DMA/2026-27/OW/WORK_INDENT59988/CALL-2
DMA/2026-27/OW/WORK_INDENT59988/CALL-2
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
8 documents required · 8 mandatory
₹500
₹16,554
20 Aug 2026
20 Aug 2026
25 Aug 2026
Open Drain work at ward no.01 near Hamapannavar Layout Kittur resd
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work (PWD SR 2023-24 Vol No.03 P.No.17 SI No.3.1 MoRT&H spec.301)
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding for Cement Concrete Drain Walls Percentage on finished rate of concrete per m3 35 (PWD SR 2023-24 Vol No.01 P.No.111 SI No.0...
Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding For Bridges Solid Slab Super Structure Percentage on finished rate of concrete per m3 20%(.PWD SR 2023-24 Vol No.01 P.No.112...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
59988 kw-1 doc.doc
Tender Document • 4.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].