Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC | L1 | Accepted-AOC being L1 | |
| 2 | L2₹49.5 L+₹3.0 L (6.52%)Rejected-Finance | L2 | Rejected-Finance Rejected being L2 | |
| 3 | L3₹49.6 L+₹3.1 L (6.72%)Rejected-Finance NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L3 | Rejected-Finance Rejected being L3 | |
| 4 | L4₹49.7 L+₹3.3 L (7.07%)Rejected-Finance | L4 | Rejected-Finance Rejected being L4 | |
| 5 | L5₹49.9 L+₹3.4 L (7.38%)Rejected-Finance NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | L5 | Rejected-Finance Rejected being L5 |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
13 Apr 2021, 6:00 pmClosed
GE I R AND D East Bangalore
GE RD East Bangalore 93
OUT SOURCING SERVICES FOR OPERATION AND MAINTENANCE OF WATER SUPPLY SYSTEM AND DG SET AT GTRE CDA RD INCLUDING CERTAIN WATER SUPPLY REPAIRS UNDER GEIRDEAST BANGALORE
2021_MES_432534_1
8122
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE I R AND D East Bangalore
D a (ii), d (v)
9 documents required · 9 mandatory
₹500
Yes
GE I R AND D East Bangalore
₹94,000
Yes
7 May 2021
23 Mar 2021
15 Apr 2021
23 Mar 2021
13 Apr 2021
6 Apr 2021
24 Mar 2021 - 31 Mar 2021
Amount
Out sourcing of services for maintenance and operation water supply system including installation in GTRE/GTX area to fill up water in tanks/sumps regulating the valves upto 150mm dia for water supply distribution except on Saturdays, Sundays and Holidays for one shift of 8 (eight) hours all as specified and directed including chlorinating the water:- (a) Water supply pumping distribution system consisting of the following :- (i) Centrifugal pumps, Valves, Open well submersible pump set and Bleaching powder dozer/chloronome plant (b) Minimum operating staff to be employed against :- (i) MPA - 2 Nos (ii) Valve Man - 2 Nos (c) Shifts timings : From 0600 hrs to 1400 hrs Note : (i) The operator/valve man to operate the water supply circulation systam at CARCASSA test rig centrifugal pumpsets, valves etc as per the requirement of user. (ii) Including attending water supply complaints in GTRE & CDA Area . (iii) Repacement of unserviceable item will be measured/paid under relevant items. (iv) Rate quoted by the contractor includes the topping up of POL to DG Set of 10 No building , PMO building, CDA R&D from E/M store when ever required,
Out sourcing of services for maintenance and operation water supply system including installation in GTRE/GTX area to fill up water in tanks/sumps regulating the valves upto 150mm dia for water supply distribution except on Saturdays, Sundays and Holidays for one shift of 8 (eight) hours all as specified and directed including chlorinating the water:- (a) Water supply pumping distribution system consisting of the following :- (i) Centrifugal pumps, Valves, Open well submersible pump set and Bleaching powder dozer/chloronome plant (b) Minimum operating staff to be employed against :- (i) MPA - 1 No (ii) Valve Man - 1 No (c) Shifts timings : From 1400 hrs to 2200 hrs Note : (i) The operator/valve man to operate the water supply circulation systam at CARSSA test rig centrifugal pumpsets, valves etc as per the requirement of user (ii) Including attending water supply complaints in GTRE & CDA Area . (iii) Repacement of unserviceable item will be measured/paid under relevant items.
Notes for item No 1 & 2 (i) The rate quoted shall be deemed to include for maintaining of required PPM of residual chlorine for drinking water at GTX / GTRE building and area, by operating chlorination plant/ bleaching dozer/using granual for chlorination. (ii) Replacement of spares such as glands, glands couplings, water seal, greasing/oiling etc of pump set. (iii) Any leakage in the pumps, main and distribution line shall be immediately attended. (iv) Cleaning of surrounding for good up keep of pump house is also responsibility of contractor. (v) However, rewinding of motor and other major repairs are out side the scope of the contract. In case of difference of opinion as to which work is termed as major repairs, the decision of GE will be final and binding and no claim what so ever on this account shall be admissible.
Operation and maintenance of the following Centrifugal pump set instaled in Fire Pump house at New Assembly Hanger, MLCP,and near by fire pump house installation as per shift including routine maintenance in order to keep the pump sets functional and deliver desired condition including checking/arresting of any leakage, replacement of gland of 'O' ring gaskets, nuts, bolts, washers and routine checks like electrical connections/controls checking, cleaning of plants, greasing to the motor, replacement of gland packing of motor/pump complete all as specified and as directed (I) Plants/machineries installed in Fire pump house at New Assembly Hanger :- (a) Centrifugal pump set mono block 2 x 75 HP 3 phase - 02 Nos (b) Centrifugal pump set mono block 2 x 05 HP 3 phase - 02 Nos (c) Jockey pump 15 HP 3 phase - 01 No (d) Terrace pump 10.5 HP 3 phase - 01 No (e) Booster pump 12.5 HP 3 phase - 01 No (II) Plants/machineries installed in Fire pump house at MLCP :- (a) Centrifugal pump set mono block 2 x 100 HP 3 phase - 02 Nos (b) Centrifugal pump set mono block 2 x 05 HP 3 phase - 02 Nos (c) Jockey pump 15 HP 3 phase - 01 No (d) Terrace pump 10.5 HP 3 phase - 01 No (e) Booster pump 12.5 HP 3 phase - 01 No (III) Plants/machineries installed near by fire pump house :- (a) Centrifugal pump set mono block 2 x 100 HP 3 phase - 02 Nos (b) Jockey pump 30 HP 3 phase - 01 No Notes :1. 01 No qualified/skilled & experienced pump operator will be employed in one shift for smooth operation of plant. 2. The unit rate quoted shall be for a month (working days in a week shall be from monday to friday) 3. Shift each day (0600 hours to 1400 hours with half an hour lunch break & 1400 hours to 2200 hours (b) Minimum operating staff to be employed against :- (i) MPA - 2 Nos 4. The contractos will be responsible for keep the palnt room and surrounding area neat & clean regularly for inspection. 5. If the operator will be absent from duty, recovery shall be effected at double the rate per shift as quoted. 6. Proper duty rosters/attendence registers will be maintained and signed by Engr-in-Charge/Contractor. 7. The replacement of defective parts carried out through maintenance contract.
All as per item No 1 described herein before but with the following pumps / valves only on Holidays,saturday & sunday for one shift of 8 (eight) hours. (a) Water supply pumping distribution system consisting of the following :- As refered item No 1 above. (b) Minimum operating staff to be employed against :- (i) MPA - 1 No (c) Shifts timings :- 0800 hrs to 1630 hrs with half an hour break. Notes for item No 1 (i) Replacement of spares such as glands, glands couplings, water seal, greasing/oiling etc of pump set. (iii) Any leakage in the pumps, main and distribution line shall be immediately attended. (iv) Cleaning of surrounding for good up keep of pump house is also responsibility of contractor. (v) However, rewinding of motor and other major repairs are out side the scope of the contract. In case of any doubt as to which work is termed as major repairs, the decision of GE will be final and binding and no claim what so ever on this account shall be entertained.
Material & Labour for removing the sludge deposit from sewage well/sump of 6.0 mtr dia and 7.0 mtr depth by using sucking through suitable tank & pump mounted on vehicle of private/State government on hiring basis and taking out sludge and transporting to suitable location all as directed by Engr-in-Charge
Cutting the existing hard standing/metal road to facilitate for laying of GI pipe line/LT cables and making good the disturbed portion to bring it to original condition with PCC 1:4:8 type D2 using 40 mm graded stone aggregate all as specified and as directed.
Excavation in trenches not exceding 1.5m wide and not exceding 1.0 sq m on plan and not exceding 1.5m depth and getting cut in hard dense soil all as specified and as directed.
Returing filling in including spreding leveling watering and well ramming in layer not exceding 25 cm as in soil all as specified and dirceted.
Removing excavated material to a distance not exceding 50 m and depostingwhere directed at a level not exceding 1.5 mtr above the starting point.
Taking out GI tubing including connection from floor wall/trenches for replacement/refixing after cleaning complete all as specified and as directed for the following sizes complete all as specified and as directed :-
Bore of pipe 15mm
Bore of pipe 20 mm
Bore of pipe 25 mm
Bore of pipe 40 mm
Bore of pipe 50 mm
Bore of pipe 80 mm
Taking down/taking up old unserviceable DI/CI pipes of 150mm bore from the trench for repairs/ replacement of the following sizes complete all as specified and as directed :-
Taking down/taking up old unserviceable DI/CI pipes of 100mm bore from the trench for repairs/ replacement of the following sizes complete all as specified and as directed :-
Supply and lay pipe galvanized, “Medium class”, including fittings 15 mm (1/2”) dia.complete all as specifiand as directed MAKE :- Jindal / Tata / Zenith
Supply and lay pipe galvanized, “Medium class”, including fittings 20 mm (3/4”) diacomplete all as specifiand as directed., MAKE :- Jindal / Tata / Zenith
Supply and lay pipe galvanized, “Medium class”, including fittings 25 mm (1.0”) dia complete all as specifiand as directed., MAKE :- Jindal / Tata / Zenith
Supply and lay pipe galvanized, “Medium class”, including fittings 40 mm (1.5”) dia complete all as specifiand as directed., MAKE :- Jindal / Tata / Zenith
Supply and lay pipe galvanized, “Medium class”, including fittings 50 mm (2.0”) dia complete all as specifiand as directed. MAKE :- Jindal / Tata / Zenith
Supply and lay pipe galvanized, “Medium class”, including fittings 80 mm (3.0”) dia complete all as specifiand as directed. MAKE :- Jindal / Tata / Zenith
Supply and lay pipe ductile Iron , S/S including specials, Class “K-7” ,100 mm (4”) dia complete all as specifiand as directed, MAKE :- Srikalahasti pipe(Lenco),Electrosteel
Supply and lay pipe ductile Iron , S/S including specials, Class “K-7” ,150 mm (6”) dia complete all as specifiand as directed MAKE :- Srikalahasti pipe(Lenco),Electrosteel
M&L for cast iron fittings for spigot and socketed pipes upto 150 mm bore such as bends (any type, radius and angle). Tapers anyh type, (straight, bend increasing, decreasing or double socket etc). Tee pieces single branch, 'Y' junction, double branch cross (all sockets or socket and spigot). collar. caps and plugs complete.
Material and labour for tyton push or rubber gasket joint suitable for ductile iron pipe of 150 mm bore of pipe ISI marked complete all as specified and as directed
Material and labour for tyton push or rubber gasket joint suitable for ductile iron pipe of 100 mm bore of pipe ISI marked complete all as specified and as directed
Supply and fixing in repairs cast iron heavy duty sluice valve with CI spindle conforming to IS-14846: 2000 PN 1.6 of size 150 mm bore including suitable size nuts,bolts,washer and rubber gasket all as specified and as directed, Make :- kartar/ kirloskar
Supply and fixing in repairs cast iron heavy duty sluice valve with CI spindle conforming to IS-14846: 2000 PN 1.6 of size 100mm bore including suitable size nuts,bolts,washer and rubber gasket all as specified and as directed Make :- kartar/ kirloskar
Supply and fixing in repairs cast iron heavy duty sluice valve with CI spindle conforming to IS-14846: 2000 PN 1.6 of size 80mm bore including suitable size nuts,bolts,washer and rubber gasket all as specified and as directed , Make :- kartar/ kirloskar
Cutting of DI/CI pipe for Alternation or Addition of existing any size of pipe line and any size of new lines laying complete all as specified and directed
Supply and fix in repair Foot valve CI body flanged type of size 150 mm heavy grade of make kirloskar or equivalent all , screwed both ends for connecting to pipeline all as specified and directed , Make :- zoloto/ Leader/ Mittal / Neta/ kirloskar
Supply and fix in repair Foot valve CI body flanged type of size 80 mm heavy grade of make kirloskar or equivalent all , screwed both ends for connecting to pipeline all as specified and directed , Make :- zoloto/ Leader/ Mittal / Neta/ kirloskar
Supply and fixing of ball valves high pressure of PTMT with epoxy coated alminium rod & high dencity plastic ball screwed for iron pipe an of 20 mm dia fixed for the following sizes incuding taking out existing unserviceable complete all as specified and directed (Minimum weight 15 mm -142 gms/200mm-20gms/25mm-455gms/40mm-690gms)
As per item no-30 above but 25 mm dia of GI pipe
Burning out lead joint in position including removig old lead from the 100 mm bore of pipe complete all as specified and directed
Burning out lead joint in position including removig old lead from the 150 mm bore of pipe complete all as specified and directed
Material and labour for run lead joint to CI spigot and socketed pipe of bore 150 mm dia including old lead of of spurn yarn complete all as specified and directed
Material and labour for run lead joint to CI spigot and socketed pipe of bore 100 mm dia including old lead of of spurn yarn complete all as specified and directed
Supply and fix in repair new Foot valve gun metal flanged type of size 50 mm heavy grade of make kirloskar or equivalent all , screwed both ends for connecting to pipeline all as specified and directed
Dismantling the unserviceable gland packing and Supply and fixing new gland packing for replacing of wornt out nut bolt washers of Slucie valve / Pump set of any Size or capacity complete all as specified and as directed.
Supply and fixing in repair gun metal globe or gate valve of size 15 mm dia with iron wheel head, screwed both ends for connecting to pipe line all as specified and directed
Supply and fixing in repair gun metal globe or gate valve of size 20 mm dia with iron wheel head, screwed both ends for connecting to pipeline all as specified and directed
Supply and fixing in repair gun metal globe or gate valve of size 25 mm dia with iron wheel head, screwed both ends for connecting to pipe line all as specified and directed
Supply and fixing in repair gun metal globe or gate valve of size 40 mm dia with iron wheel head, screwed both ends for connecting to pipe line all as specified and directed
Supply and fixing in repair gun metal globe or gate valve of size 50 mm dia with iron wheel head, screwed both ends for connecting to pipeline all as specified and directed
Dewatering the existing Aero Engine Gate RCC over head tank of 1.25 lakhs capacity drinking water tank staging and cleaning of internal wall and bottom surface of tank to remove silt / scales mud and other foreign materials using water and scrubbing with coir / jute / wire brush and washing the surfaces with fresh water cleaning the surfaces with mixture of bleaching powder and water and finally washing with fresh water and treating with one coat of white wash to internal walls bottom surfaces and ceiling of sump complete including writing CLANED ON DATE and DUE ON DATE with white paint on black paint back ground on external surface of the sump at convenient height (letter size -5 cm) all as specified and as directed.
All as per ser item No 43 above but 2 lakhs litres capacity near high mass high flow at GTRE.
Dewatering the existing Aero Engine Gate UG sumps of 2 lakhs litrs capacity and cleaning the internal wall and bottom surface of tank to remove silt / scales mud and other foreign materials using water and scrubbing with coir / jute / wire brush and washing the surfaces with fresh water cleaning the surfaces with mixture of bleaching powder and water and finally washing with fresh water and treating with one coat of white wash to internal walls bottom surfaces and ceiling of sump complete including writing CLANED ON DATE and DUE ON DATE with white paint on black paint back ground on external surface of the sump at convenient height (letter size - 5 cm) all as specified and as directed.
All as per ser item No 45 above, but 3 lakhs litres capacity at Nursury pump house at GTRE.
Dewatering the existing RCC UG sumps of 10000 litrs capacity and cleaning the internal wall and bottom surface of tank to remove silt/scales mud and other foreign materials using water and scrubbing with coir/jute/wire brush and washing the surfaces with fresh water claning the surfaces with mixture of bleaching powder and water and finally washing with fresh water and treating with one coat of cement paint to internal walls bottom surfaces and ceiling of sump complete including writing on out side of the sump CLANED ON DATE and DUE ON DATE with white paint on black paint back ground on external surface of the sump at convenient height all as specified and as directed for the following locations in GTRE (a) Near foundry (b) Near Bldg No 10
All as per item No 47 described here in before but 12000 ltrs capacity UG Sump at New Assembly Hanger near New pump house at GTRE.
All as per item No 47 described here in before but 20000 litrs capacity UG sump Near old Admin building at GTRE.
All as per item No 47 described here in before but 25000 ltrs capacity UG Sump Near Dynamic spin rig at GTRE.
All as per item No 47 described here in before but 40000 litrs capacity UG sump Near 7 A building shaft fatigue test rig at GTRE.
All as per item No 47 described here in before but 40000 ltrs capacity UG Sump Central AC Plant back side of Engineer service building at GTRE.
All as per item No 47 described here in before but 100000 ltrs capacity fire fighting UG Sump back side of Building No 10
Dismantling and taking out the existing unserviceable mono block centrifugal pump / Submersible pump set by disconnecting the cable connection suction and delivery pipe lines of the pump set,separate the motor from pump,transporting to workshop,removing the burnt out winding fromslots,cleaning the starter and rotor slots with CTC and emery pape and rewinding the motor with as per existing size of new supper enameled copper winding wire and insulating by using class 'B' insulation keeping for drying,bring back to site,reassemble the motor and pump,fixing in position, connecting electric connectios testing and commissioning for its satisfactory performance including taking down old unserviceable copper winding complete all as specified and directed for up to 5 HP capacity
All as per item No 54 above but of 7.5 HP to 10 HP three phase pump set
All as per item No 54 above but of 15 HP to 20 HP three phase pump set
All as per item No 54 above but of 30 HP three phase pump set
All as per item No 54 above but of 30 HP three phase pump set
All as per item No 54 above but of 75 HP To 100 HP three phase pump set
Supply and fix in replacement direct-om-line(DOL) starter suitable for mono block pumpset upto to maximm 7.5 HP capacity type complete all as specified and directed Make: L&T , Crompton Greeves/Siemens /GE
Supply and fix in replacement direct-om-line(DOL) starter with complete voit meter/ameter including indicator suitable for mono block pumpset upto to maximm 7.5 HP to 12.5 HP capacity complete all as specified and directed Make: L&T /Crompton Greeves/Siemens /GE
Material and labour for replacement of existing rusted/unserviceable angle iron ladder in the UG sump/ OH Tank with angle iron of 40 x 40 x 6 mm for the height of not less than 8 mtr length by suitable welding and painting with one coat of black paint over a coat of red oxide primer complete all as directed
Dismantle the broken valve chamber of size 90x90x90cm and construct of new brick masonry valve pit of internal size 90x90x90cm with 230mm thick brick wall built in cement mortar 1:6, plain cement concrete foundation 1:4:8 type D2, plastering on brick surfaces 10mm thick in cement mortar 1:4 covered with MS plain sheet 3 mm thick duly fixed to MS frame size 40x40x4mm and duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4 type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and as directed by Engineer in charge.
Dismantle the broken valve chamber of size 90x90x60cm and construct of new brick masonry valve pit of internal size 90x90x60cm with 230mm thick brick wall built in cement mortar 1:6, plain cement concrete foundation 1:4:8 type D2, plastering on brick surfaces 10mm thick in cement mortar 1:4 covered with MS plain sheet 3 mm thick duly fixed to MS frame size 40x40x4mm and duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4 type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and as directed by Engineer in charge.
Material and labour for brick masonry valve pit of internal size 60x60x60cm with 230mm thick brick wall built in cement mortar 1:6, plain cement concrete foundation 1:4:8 type D2, plastering on brick surfaces 10mm thick in cement mortar 1:4 covered with MS plain sheet 3 mm thick duly fixed to MS frame size 40x40x4mm and duly embedded in plain cement concrete coping 5 cm thick plain cement concrete 1:2:4 type B1with opening and locking arrangements including painting with two coat of synthetic enamel paint over one coat of primer complete all as specified and as directed by Engineer in charge.
Supply and fix in repairs Aviation obstruction light LED comprising of aluminium housing with polycarbonate enclosure 302 Nos LED type complete all as specified and as directed Make: Bajaj /Havells/Crompton/Philips
Supply & fixing in replacementof 15mtrs long, 63mm dia. Reinforced Rubber Lined hose with instantaneous male and female coupling complete all as specified and directed
Supply & fixing in replacement fire Gun metal hydrant landing valve (Double head outlet) of 63 mm dia conforming to IS 5290 complete all as specified and directed
Supply & fixing in replacement metal fire hydrant landing valve (single head outlet) of 63 mm dia conforming to IS 5290
Supply and fix in repairs Aviation obstruction light LED comprising of aluminium housing with polycarbonate enclosure 302 Nos LED type complete all as specified and as directed Make: Bajaj /Havells/Crompton/Philips
Repair and Replacement of M.S Hose cabinet double door fabricated out of M.S sheet of 18 swg. CRCA sheet with glass fronted(4mm thick glass with rubber beading) door and size of the cabinet shall be 700mm x 600mm x250mm double door mounting , all fasteners etc, and cabinet shall be powder coated of approved colour both inside and outside etc complete all as specified and directed
Supply & fixing of Hose reel drum of swinging type with 19mm dia Rubber braided hose of 30Mtr Length with Gate valve (upstream) and Shut off nozzle,complete all as specified and directed
M & L for Painting to existing pump sets of capacity 5 HP to 30 HP with on coat of synthetic enamel paint of existing colour over a coat of red oxide primer complete all as specified and directed
Material & Labour for one coat of external painting of water supply installation including UG sump ,OH tanks, complete all as specified and directed
GURU ENTERPRISES
UNIVERSAL ENGINEERING
Sahara Engineers
Glacier Cooling Solutions Private Limited
Radikan
RAHUL ENTERPRISES
shashi shekar construction
M/S SRI BALAJI ENTERPRISES
Lucky Enterprises
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .