Loading…
Loading…
Tender Value
₹4608.0 Cr
EMD Value
₹92.2 Cr
Closing Date
9 Sept 2026, 11:00 am7d left
No
No
Two Packet System
Normal Tender
Yes
25/07/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (WMS)
TECHNICAL
13 conditions · 2 needing a document upload
Financial Capacity is as per Clause 2.2.2(B) of Tender Document volume- 1: RPF
Technical Capacity is as per Clause 2.2.2(A) of Tender Document volume-1: RPF
10 conditions · 4 needing a document upload
Goods & Services Tax (GST) registration certificate copy shall be attached.
PAN details shall be attached.
The PSU has an option to take payment from Railways through a letter of credit (LC) arrangement as per Railway Board Letter No: 2018/CE-I/CT/9, New Delhi, dated:04.06.2018.
Please submit your bank details i.e. Name of Bank along with Bank Branch Code, Accounts Number as appearing in the cheque book, IFSC Code and PAN Number, duly certified by the authorized official of the bank, to facilitate payment through ECS/NEFT/RTGS. In lieu of the bank certificate photo copy/scanned copy of a cancelled cheque may be attached for verification of the above particulars.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The participating PSUs shall quote single rate for each schedule as percentage "above or below or At par" the maintenance Fee as specified in the RFP.
GST will be paid as per GST Law, GST/SGST/UTGST/IGST as amended by Central/State Governments from time to time. GST will be paid as per actual and input credit for GST to be passed on to Indian Railways.
Operation & Maintenance of Dabhoi Workshop (ELW/DB) and Maintenance of 3 phase Locomotive (POH of WAP7 and WAG9, IOH of Motorized Bogie of CO-CO type, IOH of Traction Motor of 6FRA 6068 type) for a period of 18 year
ELWDB2526LOCOPOH06R
ELWDB2526LOCOPOH06R
Limited
Works - General
216 Months
Unknown (Unspecified Location)
₹0
₹92.2 Cr
30 Jun 2026
30 Jun 2026
26 Aug 2026
25 Jul 2026
335 items across 8 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,69,68,85,319.2 | ||
| — | 3.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 1st year | — | — | — | 6,20,79,156.75 | |
| — | 5.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 2nd year | — | — | — | 10,63,36,447.55 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 3rd year | — | — | — | 26,20,98,321.12 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 4th year | — | — | — | 26,89,89,168.12 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 5th year | — | — | — | 27,58,80,015.24 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 6th year | — | — | — | 28,27,70,862.24 | |
| — | 12.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 7th year | — | — | — | 28,96,61,709.24 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 8th year | — | — | — | 32,12,65,269.39 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 9th year | — | — | — | 32,87,30,353.64 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 10th year | — | — | — | 33,61,95,437.89 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 11th year | — | — | — | 34,36,60,522.27 | |
| — | 13.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 12th year | — | — | — | 35,11,25,606.52 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 13th year | — | — | — | 38,61,74,590.06 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 14th year | — | — | — | 39,42,13,911.56 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 15th year | — | — | — | 40,22,53,233.2 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 16th year | — | — | — | 41,02,92,554.7 | |
| — | 14.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 17th year | — | — | — | 41,83,31,876.34 | |
| — | 15.00 | — | — | ||
| Maintenance fees of 1st POH of WAP-7 Locomotive for 18th year | — | — | — | 45,68,26,283.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CorrigendumNo.1_1.pdf
ATTACHMENT
Pre-BidMeet25.07.2026Queriesreplies_1.pdf
ATTACHMENT
TENDERDocument.pdf
ATTACHMENT
TenderDocumentVolume1RFP.pdf
ATTACHMENT
TenderDocumentVolume2Agreement.pdf
ATTACHMENT
TenderDocumentVolume3Scopeofworkspecialtermsandcondition.pdf
ATTACHMENT
Mustchangeitemcirculars.pdf
ATTACHMENT
IRGCCWorksuptoACS11.pdf
ATTACHMENT
Pre-BidMeet25.07.2026Queriesreplies_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].