Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.3 L+₹1.1 L (6.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹19.5 L+₹1.3 L (7.19%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹20.2 L+₹2.0 L (10.8%)Rejected-Finance FLAT NO 4 LUNAWAT REALTY PLINTH 4B NINA SOCIETY SURVEY NO 148 PAUD ROAD KOTHRUD PUNE 34 | PUNE | PUNE | MAHARASHTRA | 411034 | L4 | Rejected-Finance L4 | |
| 5 | L5₹20.2 L+₹2.0 L (10.9%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹22.7 L
EMD Value
₹22,700
Closing Date
3 Oct 2019, 5:45 pmClosed
Executive Engineer TLIPMD Ogelwadi Tal Karad Dist
Executive Engineer TLIPMD Ogelwadi Tal Karad Dist Satara Maharashtra
Detail survey planning design preparing detailed estimate for command area development work by closed pipe distribution network system for Link canal II km 1 to 25 and Khanapur Tasgaon Canal km 27 to 41 of Tembhu Lift Irrigation Project
2019_CWRDP_499990_1
2019 PDN Survey for Khanapur Tasgaon Link Canal
Open Tender
Survey
Percentage
270 days
vita
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,360
Online Payment
₹22,700
22 Jan 2020
19 Sept 2019
5 Oct 2019
19 Sept 2019
3 Oct 2019
19 Sept 2019
eProcurement System Government of Maharashtra Created By: Rajan Reddiyar Created Date/Time: 05-Nov-2019 06:19 PM Tender Title: Detail survey planning design preparing detailed estimate for command area development work by closed pipe distribution network system for Link canal II km 1 to 25 and Khanapur Tasgaon Canal km 27 to 41 of Tembhu Lift Irrigation Project Tender ID: 2019_CWRDP_499990_1
Tender Inviting Authority: Tembhu Lift Irrigation Project Management Division, Oglewadi
Name of Work: Detail survey planning design preparing detailed estimate for command area development work by closed pipe distribution network system for Link canal II km 1 to 25 and Khanapur Tasgaon Canal km 27 to 41 of Tembhu Lift Irrigation Project.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 sarathi engineers 2267226.00 -11.11 2015337.19 Twenty Lakh Fifteen Thousand Three Hundred and Thirty Seven
2.00 Pioneer, Consulting Engineers & Contractors 2267226.00 -11.00 2017831.14 Twenty Lakh Seventeen Thousand Eight Hundred and Thirty One
3.00 Atish Dattatraya Harbhare 2267226.00 -10.33 2033021.55 Twenty Lakh Thirty Three Thousand Twenty One
4.00 INDRAJIT VEERDHVAL KARKHANIS 2267226.00 -14.95 1928275.71 Ninteen Lakh Twenty Eight Thousand Two Hundred and Seventy Five
5.00 Ashish S Waghchaure 2267226.00 -14.00 1949814.36 Ninteen Lakh Fourty Nine Thousand Eight Hundred and Fourteen
6.00 SHRI. U. D. KADAM 2267226.00 -19.77 1818995.42 Eighteen Lakh Eighteen Thousand Nine Hundred and Ninty Five
Lowest Amount Quoted BY: SHRI. U. D. KADAM(1818995.42)
BOQ Summary Details Tender Title: Detail survey planning design preparing detailed estimate for command area development work by closed pipe distribution network system for Link canal II km 1 to 25 and Khanapur Tasgaon Canal km 27 to 41 of Tembhu Lift Irrigation Project Tender ID: 2019_CWRDP_499990_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SHRI. U. D. KADAM 1818995.42 L1
2 INDRAJIT VEERDHVAL KARKHANIS 1928275.71 L2
3 Ashish S Waghchaure 1949814.36 L3
4 sarathi engineers 2015337.19 L4
5 Pioneer, Consulting Engineers & Contractors 2017831.14 L5
6 Atish Dattatraya Harbhare 2033021.55 L6
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 2.49 MB
pdnsurvey.pdf
Tender Document • 3.50 MB
BOQ_876744.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .