| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹17.5 L+₹10,750 (0.62%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹20.8 L+₹3.4 L (19.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Tender fee invaild |
| Sl No | Description | Qty | Unit | IMTIYAZ CONSTRUCTIONS AND ELECTRICALS L1 | M/s ZAHID CONTRACTORS L2 | Precision Engineers and Buildings L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard. | 20 | No. | 43,000 ₹8,60,000 | 28,300 ₹5,66,000 Lowest | 45,000 ₹9,00,000 |
| 2.00 | Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix, 0.5 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard. | 20 | No | 2,000 ₹40,000 Lowest | 3,000 ₹60,000 | 3,000 ₹60,000 |
| 3.00 | Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles | 20 | No | 600 ₹12,000 Lowest | 1,500 ₹30,000 | 1,800 ₹36,000 |
| 4.00 | Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard. | 20 | No | 400 ₹8,000 Lowest | 1,000 ₹20,000 | 1,500 ₹30,000 |
| 5.00 | Supply , installation ,testing & commissioning of Iron GI Channel/Angle/Flat of sizes including clamps for Transformer Pad/G.I Channel Bedding ,L.A Set/G.O Set/Horn Gapas per specification enclosed in Drawing.( Refer Drawing) | 2,500 | Kgs | 200 ₹5,00,000 | 260 ₹6,50,000 | 150 ₹3,75,000 Lowest |
| 6.00 | Supply , installation ,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type as per REC standard | 10 | set | 10,000 ₹1,00,000 Lowest | 12,000 ₹1,20,000 | 15,000 ₹1,50,000 |
| 7.00 | Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification | 10 | set | 9,000 ₹90,000 | 4,000 ₹40,000 Lowest | 9,000 ₹90,000 |
| 8.00 | Supply , installation ,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 10 | set | 2,800 ₹28,000 Lowest | 3,000 ₹30,000 | 8,000 ₹80,000 |
| 9.00 | Supply , installation ,testing & commissioning of LT fuse set with connectors , LT insulators mounted on Angle Iron 45*45*mm frame as per Drawing enclosed. | 10 | set | 900 ₹9,000 Lowest | 3,000 ₹30,000 | 4,000 ₹40,000 |
| 10.00 | Supply , installation ,testing & commissioning of --Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover as per REC standard. | 30 | No | 500 ₹15,000 Lowest | 500 ₹15,000 Lowest | 3,000 ₹90,000 |
Tender Value
₹17.5 L
EMD Value
₹34,900
Closing Date
4 Aug 2025, 4:00 pmClosed
Executive Engineer ED Handwara
Office of Executive Engineer ED Handwara
Renovation and Modernization of Distribution Sub-stations for ED Handwara under UT Capex Budget 2025-26
2025_PDD_281279_1
e-NIT 06 of 2025-26
Open Tender
Electrical Works
Lump-sum
90 days
Office of Executive Engineer ED Handwara
Refer to SBD
2 documents required · 2 mandatory
₹1,000
Office of Executive Engineer ED Handwara
₹34,900
9 Aug 2025
14 Jul 2025
5 Aug 2025
16 Jul 2025
4 Aug 2025
16 Jul 2025
Amount
Supply , Carriage upto site , Erection , Testing and Commissioning of Steel Tubular Poles 9 Mtr Long (410-SP-33) with Planting depth of 1/6 th of the height of Poles as per REC standard.
Cement bottoming of S T Ploes 9Mtrs long in 1:2:4 mix, 0.5 cum/pole, muffing 20 cm above ground, including plaster and curing of concrete as per REC standard.
Supply and Painting of poles with one coat of redoxide and two coats of Aluminium paint of standard quality including Marking of Poles
Supply , installation ,testing & commissioning of pole Earthing Complete by GI Pipe 40 mm 3mtr long through GI Strip 25x3 mm as per REC standard.
Supply , installation ,testing & commissioning of Iron GI Channel/Angle/Flat of sizes including clamps for Transformer Pad/G.I Channel Bedding ,L.A Set/G.O Set/Horn Gapas per specification enclosed in Drawing.( Refer Drawing)
Supply , installation ,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type as per REC standard
Supply , installation ,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A confirming to ISI specification
Supply , installation ,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply , installation ,testing & commissioning of LT fuse set with connectors , LT insulators mounted on Angle Iron 45*45*mm frame as per Drawing enclosed.
Supply , installation ,testing & commissioning of --Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover as per REC standard.
Supply & fixing ,testing, commissioning of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm as per REC specification.
Supply , installation ,testing , commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mmas per REC specifications.
Supply & laying, testing ,commissioning of 120 mm² single core Cable,1.1kV Grade, XLPE Insulated Stranded Conductor FRLS type
Supplying and Fixing of Danger Plates with clamps with writing in English and Regional Language
Supply , installation ,testing & commissioning of Sundry items like Aluminium lugs, Jumpers, binding Tape,
Supply & fixing of GI nuts and bolts of sizes
Dismantling of Existing Material and return of same in divisional stores, including transportation, loading & un-loading.(complete Job)
Providing, Installation, Fabrication of Sign Board of dimensions 3ft' x 2ft', 2mm MS Painted Sheet indicating Name of the work, Name of Loaction/Block, Name of Scheme, Est. Cost, Year & Executing Agency:
M/s ZAHID CONTRACTORS (BID ID -2430857)
Precision Engineers and Buildings (BID ID -2432380)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .