Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | Admitted-Finance |
| 2 | Admitted-Finance PTAEL NAGAR TELIPHONE EXCHANGE BIJROL ROAD BARAUT BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Admitted-Finance |
| 3 | Admitted-Finance BINOLI ROAD GANDHI COLONY BUS STAND BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Admitted-Finance |
| 4 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹20,000
Closing Date
20 May 2020, 1:00 pmClosed
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Work of Annual Maintenance of 220 KV Sub-Station Gokul, Mathura under ETD, Mathura
2020_UPTCL_464373_1
ET-03/ETC(M)/20-21
Open Tender
Electrical Works
Lump-sum
365 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD Mathura
₹20,000
26 May 2020
30 Apr 2020
21 May 2020
30 Apr 2020
20 May 2020
30 Apr 2020
Daily / Weekly / Monthly & Yearly Maintenance of all equipments & bus bar at 220/132/33 KV switch yard including all control & relay panels installed at 220 KV S/S Gokul (Mathura) for a period of one year including cleaning as detailed in scope of work. All the routine/preventive & breakdown maintenance of 220 KV Gokul S/S shall be in the scope of Contractor. The maintenance and other works shall be done on the routine basis. But in case of emergency, maintenance team shall be available at any time as per instruction of EE, Concerned or his representative . Per day general maintenance team consisting of 2 no. Fitter,2 no. electrician,2 no unskilled labour/Coolie,1 no Gardner and 1 no. sweeper will have to be maintained. (for a period of one year).
Providing of following testing kits along with operating engineer for testing of 220 and 132 KV bays /Transformer during the year-1.Thermovision camera (Minimum 3 times in a year) 2.Tan delta kit 3.DCRM kit 4.Open/Close timing kit for CB . Contractor shall also provide testing kits with operating engineer in case of emergency without any extra cost as directed by engineer in charge.
Cleaning switchyard including uprooting of rank vegetation, small plants ,removing of grass bushes and collection of foreign material like ballast, pebbles, throwing out uprooted grass, foreign material like ballast, pebbles outside the periphery of the switchyard 3 times in a year (3X31800).
Switch yard (24500 m2)
Open store yard (6500 m2)
Both side of road main gate to control room (800 m2)
P&H Engineering
M/S DHARMENDRA CHAUDHARY
Katyani Construction Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .