| 1 | ACMC of 1 No. x 120 TR AC Plant - First Year | Annual Comprehensive Maintenance Contract of 1 X 120 TR Reciprocating AC Plants (Model No. - 10126-2E, Sr. No. - D000002) along with electrical starter panels i/c replacing of necessary spare parts as & when required, carrying out routine-preventive & breakdown maintenance, monthly servicing, descaling of Condenser lines once in a year, etc complete as required as per Special conditions and Schedule of Maintenance.
a) First Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 2 | ACMC of 1 No. x 120 TR AC Plant - Second Year | Annual Comprehensive Maintenance Contract of 1 X 120 TR Reciprocating AC Plants (Model No. - 10126-2E, Sr. No. - D000002) along with electrical starter panels i/c replacing of necessary spare parts as & when required, carrying out routine-preventive & breakdown maintenance, monthly servicing, descaling of Condenser lines once in a year, etc. complete as required as per Special conditions and Schedule of Maintenance.
a) Second Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 3 | Repairing and Servicing of existing 120 TR AC Plant | Repairing and servicing of the existing 120 TR Reciprocating AC Plants (Model No. - 10126-2E, Sr. No. - D000002) work includes required refrigrant gas top-up, replacement of the components, etc. complete as required as per the site condition and direction of the Engineer-in charge | 1 | Job | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 4 | ACMC of AHUs system - First Year | Annual Comprehensive Maintenance Contract of Air Handling units system containing different capacity of AHUs (total 29 AHUs with total CFM capacity of 349000 CFM), with air distribution ducting system & chilled water distribution piping system & its parts including valves, strainers, Electrical panels, VFD, starter Panels, Cabling, wiring. AHU Motor i/c rewinding, replacement of all type of (Shaft / Blocks) bearings, alignment, fabrication, replacing of necessary spare parts.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
a) First Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 5 | ACMC of AHUs system - Second Year | Annual Comprehensive Maintenance Contract of Air Handling units system containing different capacity of AHUs (total 29 AHUs with total CFM capacity of 349000 CFM), with air distribution ducting system & chilled water distribution piping system & its parts including valves, strainers, Electrical panels, VFD, starter Panels, Cabling, wiring. AHU Motor i/c rewinding, replacement of all type of (Shaft / Blocks) bearings, alignment, fabrication, replacing of necessary spare parts.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
b) Second Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 6 | ACMC of Chilled Water pumping system-First Year | Annual Comprehensive Maintenance Contract of Chilled water Pumping system (02 Nos x 50 HP) & (02 Nos x 40 HP - These 02 pumps are under DLP for one year so only preventive maintaince is to be carried out for 1st Year) and condenser water pumping system (04 x 25 HP) consists of pump motor sets, starter panels, piping with component and other accessories i/c Motor rewinding, pump overhauling, replacement of bearings, panel contactors, bushes, single phase preventers, relays, fuses, timers, TPN/MCBs, connectors, necessary wiring, gland rope, replacing of necessary spare parts, connecting piping with its parts including valves & strainers.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special Conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
a) First Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 7 | ACMC of Chilled Water pumping system-Second Year | Annual Comprehensive Maintenance Contract of Chilled water Pumping system (02 Nos x 50 HP) & (02 Nos x 40 HP - These 02 pumps are under DLP for one year so only preventive maintaince is to be carried out for 1st Year) and condenser water pumping system (04 x 25 HP) consists of pump motor sets, starter panels, piping with component and other accessories i/c Motor rewinding, pump overhauling, replacement of bearings, panel contactors, bushes, single phase preventers, relays, fuses, timers, TPN/MCBs, connectors, necessary wiring, gland rope, replacing of necessary spare parts, connecting piping with its parts including valves & strainers.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special Conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
b) Second Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 8 | ACMC of Low Side HVAC System - First Year | Annual Comprehensive Maintenance Contract of Low side of the HVAC system including (iii) 2 X 500 TR Cooling Tower along with total 04 nos. 10 HP motor and accessories with fan motor sets and VFD starter control panel i/c Motor rewinding, replacement of bearings, fan mechanism over hauling, replacing of necessary spare parts, connecting piping with its parts including valves & strainers.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special Conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
a) First Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 9 | ACMC of Low Side HVAC System - Second Year | Annual Comprehensive Maintenance Contract of Low side of the HVAC system including (iii) 2 X 500 TR Cooling Tower along with total 04 nos. 10 HP motor and accessories with fan motor sets and VFD starter control panel i/c Motor rewinding, replacement of bearings, fan mechanism over hauling, replacing of necessary spare parts, connecting piping with its parts including valves & strainers.
It is required to carryout routine-preventive & breakdown maintenance, servicing and repairing, etc. complete as required as per Special Conditions & Schedule of Maintenance, site requirement and direction of Engineer In charge.
b) Second Year | 12 | Month | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |
| 10 | Repairing of existing fire damper system | Repairing of the existing fire damper system, work includes required wiring, replacement of the components, etc. complete as required as per the site condition and direction of the Engineer-in charge | 29 | Job | Rajesh Shyamlal Tamrakar N 400099,Airports Authority Of India ,Operational Offices, New Airport Colony ,Opp Parsiwada ,Sahar Road , Andheri&#x 28;E &#x 29;. | 731 |