| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹2.3 L (0.71%)Admitted-Finance | ₹3.3 Cr+₹2.3 L (0.71%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹2.6 L (0.79%)Admitted-Finance | ₹3.3 Cr+₹2.6 L (0.79%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹2.6 L (0.79%)Admitted-Finance | ₹3.3 Cr+₹2.6 L (0.79%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 Cr+₹2.6 L (0.79%)Admitted-Finance | ₹3.3 Cr+₹2.6 L (0.79%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED L1 | K K Rao Engineering Works Pvt Ltd L5 | VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED L10 | Asia Power Electrical LLP L6 | SHREE ABIRAMI ENGGINEERING WORKS L7 | Ascott Electricals Pvt Ltd L8 | SAP INDUSTRIES L9 | ABIRAMI ENGINEERING L2 | M/s K R K Power Pvt Ltd L4 | Tanvikrishna Transformers L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ABSTRACT | |||||||||||||
| 1.10 | Supply of materials & Labour Charges for 10 MVA Power Transformer | 1 | Nos. | 37,71,451.46 ₹37,71,451.46 Lowest | 37,91,965.64 ₹37,91,965.64 | 46,67,963.9 ₹46,67,963.9 | 37,73,603.54 ₹37,73,603.54 | 37,92,790.46 ₹37,92,790.46 | 38,28,148.92 ₹38,28,148.92 | 38,28,148.92 ₹38,28,148.92 | 37,89,570.12 ₹37,89,570.12 | 37,92,749.16 ₹37,92,749.16 | 37,91,972.72 ₹37,91,972.72 |
| 1.20 | Supply of materials & Labour Charges for 16 MVA Power Transformer | 1 | Nos. | 39,67,659.38 ₹39,67,659.38 Lowest | 39,87,857.44 ₹39,87,857.44 | 49,18,273.28 ₹49,18,273.28 | 39,80,668.76 ₹39,80,668.76 | 39,88,899.38 ₹39,88,899.38 | 40,27,200.76 ₹40,27,200.76 | 40,27,200.76 ₹40,27,200.76 | 39,85,826.54 ₹39,85,826.54 | 39,88,480.48 ₹39,88,480.48 | 39,88,039.16 ₹39,88,039.16 |
| 1.30 | Supply of materials & Labour Charges for 25 MVA Power Transformer | 1 | Nos. | 41,77,812.66 ₹41,77,812.66 Lowest | 42,00,350.66 ₹42,00,350.66 | 51,80,968.42 ₹51,80,968.42 | 41,82,891.26 ₹41,82,891.26 | 41,99,052.66 ₹41,99,052.66 | 42,40,504.64 ₹42,40,504.64 | 42,40,504.64 ₹42,40,504.64 | 41,95,853.56 ₹41,95,853.56 | 41,98,658.54 ₹41,98,658.54 | 41,98,144.06 ₹41,98,144.06 |
| 1.40 | Supply of materials & Labour Charges for 50 MVA Power Transformer | 1 | Nos. | 44,32,784.12 ₹44,32,784.12 Lowest | 44,98,764.4 ₹44,98,764.4 | 55,55,483.9 ₹55,55,483.9 | 45,42,187.1 ₹45,42,187.1 | 44,98,666.46 ₹44,98,666.46 | 45,51,691.88 ₹45,51,691.88 | 45,51,691.88 ₹45,51,691.88 | 44,95,356.44 ₹44,95,356.44 | 44,98,583.86 ₹44,98,583.86 | 45,00,038.8 ₹45,00,038.8 |
Tender Value
₹25 Cr
EMD Value
₹25 L
Closing Date
30 May 2022, 2:00 pmClosed
CE/TP-I/Chennai
A10 Thiru vi ka Indl Estate Guindy Chennai 32
Repairing and reconditioning of 110kV class power transformers in TP1 Region and erection after rectification
2022_EB_231191_1
TP1-015/22-23
Open Tender
Electrical Works
Works
730 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25 L
Yes
20 Jun 2022
5 May 2022
31 May 2022
5 May 2022
30 May 2022
5 May 2022
ABSTRACT
Supply of materials & Labour Charges for 10 MVA Power Transformer
Supply of materials & Labour Charges for 16 MVA Power Transformer
Supply of materials & Labour Charges for 25 MVA Power Transformer
Supply of materials & Labour Charges for 50 MVA Power Transformer
ABIRAMI ENGINEERING
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
Asia Power Electrical LLP
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Asia Power Electrical LLP
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
Tanvikrishna Transformers
SHREE ABIRAMI ENGGINEERING WORKS
M/s K R K Power Pvt Ltd
Ascott Electricals Pvt Ltd
SAP INDUSTRIES
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
Asia Power Electrical LLP
Ascott Electricals Pvt Ltd
SAP INDUSTRIES
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Asia Power Electrical LLP
ABIRAMI ENGINEERING
K K Rao Engineering Works Pvt Ltd
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Asia Power Electrical LLP
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Asia Power Electrical LLP
ABIRAMI ENGINEERING
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
Ascott Electricals Pvt Ltd
SAP INDUSTRIES
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Tanvikrishna Transformers
M/s K R K Power Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
Asia Power Electrical LLP
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Asia Power Electrical LLP
ABIRAMI ENGINEERING
M/s K R K Power Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
Tanvikrishna Transformers
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
Tanvikrishna Transformers
K K Rao Engineering Works Pvt Ltd
HINDUSTHAN HEQVY ELECTRICALS PRIVATE LIMITED
SHREE ABIRAMI ENGGINEERING WORKS
M/s K R K Power Pvt Ltd
SAP INDUSTRIES
Ascott Electricals Pvt Ltd
Asia Power Electrical LLP
VENKATESWARA ELECTRICAL INDUSTRIES PRIVATE LIMITED
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Civil work if required as per site conditions
Civil work if required as per site conditions
Civil work if required as per site conditions
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Charges for transporting transformer along with accessories from the site to the firm's works
HV bushing Terminal (Timble) Tinned copper
HV bushing Terminal (Timble) Tinned copper
HV bushing Terminal (Timble) Tinned copper
HV bushing Terminal (Timble) Tinned copper
HV bushing Terminal (Timble) Tinned copper
HV bushing Terminal (Timble) Tinned copper
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_272572.xls
BOQ • 0.98 MB
110kVRCfinal.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .