Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LQualified NEW NO 110 OLD NO 92 SF MARINE OFFSHORE INDUSTRIAL SUPPLY 110 EAST MADA CHURCH STREET ROYAPURRAM ROYAPURAM | L1 | Qualified MSE, Category: General | |
| 2 | L2₹3.4 L+₹24,505 (7.66%)Qualified GROUND FLOOR JN ROAD HADDO SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | L2 | Qualified | |
| 3 | L3₹3.5 L+₹32,590 (10.2%)Qualified | L3 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
4 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ac routine
5078595
GEM/2023/B/3735041
Two Packet Bid
AC Routine,E-68,AC Routine,E68,AHU Routine,E69,AHU Routine
90 days
Andaman And Nicobar Islands; Nicobars
Total value wise evaluation
BOQ
4 documents required · 4 mandatory
2 yrs
10%
Exempted
4 Aug 2023
25 Jul 2023
4 Aug 2023
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | AC Routine | E 68 Yearly routine of AC plant Make Kirloskar 12TR 1 Chemical cleaning of both condenser 2 Deterioted Shock mounts rubber to be replaced 3 Check for leaks in the refrigeration lines and rectified | 1 | Job | [email protected] | 90 |
| 2 | E-68 | 4 Renew sheets and gaskets of condenser end cover inlet/outlet sea water pipe line 5 Functional test of two way expention valve and solenoid valve replaced if defective | 1 | Job | [email protected] | 90 |
| 3 | AC Routine | 6 Replace compressor oil 7 Replace cores of filter drier 8 replace zinc protectors plugs of both condenser 9 carry out pressure test and vaccum test for 24 hrs and proved | 1 | Job | [email protected] | 90 |
| 4 | E68 | 10 Functional test of 06 nos brassomatic valves and LP & HP side charging valves replace if defective 11 Suction line and liquid line vibration eliminators to be replaced | 1 | job | [email protected] | 90 |
| 5 | AHU Routine | 1 check duct connecton hoses damaged hoses to be replaced 2 damages of coating to be re touched 3 check weather the connection are intact and vibration dampers not harmed | 1 | Job | [email protected] | 90 |
| 6 | E69 | 4 Check the coating and casing of fan 5 check fan and motors are turning and in balance defective belt to be replaced | 1 | Job | [email protected] | 90 |
| 7 | AHU Routine | 6 Check for corrosion and leakage of cooling coil 7 Carry out chemical cleaning of cooling coils 8 Blow through the cooling coil with air stream from counter flow direction | 1 | job | [email protected] | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_5078595.pdf
GEM_BID
boq-ac-routine_2023-07-24-16-34-30_327c5709a7215a12e9b541bd8a87865d.pdf
BOQ
boq_item_sample_file_2023-07-24-16-34-30_fb13059afa05ae54af025bc99d31fc32.csv
BOQ
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .