Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹2,000
Closing Date
2 Aug 2025, 4:00 pmClosed
SE EDC-I, RAEBARELI
SE EDC-I, RAEBARELI
WORK MENSION IN BOQ
2025_MVVNL_1058266_1
35/EDC-I,R/2025-26
Open Tender
Electrical Works
Item Wise
30 days
UNDER EDD RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EX ENGINEER C AND MC RAEBARELI
₹2,000
5 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
2 Aug 2025
19 Jul 2025
Amount
(A) Safe loading & carriage including Loading-unloading & proper stacking of following store materials from ESC Tripula to site of work.
8.5 Mtr Long PCC POLE
9 Mtr Long ST POLE (SP-37)
13 Mtr Long ST POLE (SP-70)
TD 25 KVA/11/0.43 KV L-II 4 STAR AL. WOUND
100 KVA/11/0.4 KV T/F NEW
LOOSE LINE MATERIAL ACSR WEASEL CONDUCTOR (70 Mtr.), G.I. WIRE 6 SWG (20 Kg.), G.I. WIRE 8 SWG (4 Kg.), 11 KV COMPOSIT POLYMER PIN INSULATOR (18 No), Cable Box O/D 11KV 3X70 XLPE (8 No.), TOP CHANNEL (3 No.), S/S BASE ANGLE (4 No.), MS ANGLE 50X50X6 MM (15 Kg.), 11 KV TPMO SWITCH (2 No.), X-ARM V-TYPE 11 KV (2 No.), EARTH ROD 2540X20 MM COMPLETE (7 No.), DROPPER CHANNEL (100X50XMM) (2 No.), 11KV HT XLPE CABLE 3X70 SQ MM (55 No.) Etc.
MET.U. O/D TYPE CT/PT 11 KV CTR 15/5 AMP.
11 KV PILFER PROOF METERING CUB. CTR 15/5 Amp.
ERRECTION
Errection of 8.5 Mtr long PCC Pole including digging of Pits & fitting of accessories.
Errection of 09 Mtr long ST Pole On DP including digging of Pits & fitting of accessories.
Errection of 13 Mtr long ST Pole including digging of Pits & fitting of accessories.
Earthing of poles as per RESSPO norms.
Grouting of Poles as per RESSPO norms with grouting materials.
Laying, stringing & sagging of 3Ø3wire 11 kv HT line by Weasal conductor including all associated works & making clearance of road with joints/jumpers & binding on insulators as required as per RESSPO norms.
Mounting/Installation of New 11 Pilfer Proof Metering Quibical Ratio with cable Termination kit. CTR. 15/5A Complete in all respect as per RESSPO norms.
MET.U. O/D TYPE CT/PT 11 KV CTR 15/5 AMP.
Laying of 11KV XLPE cable of size 3X70 mm2. complete in all respect as per RESSPO norms.
Instalation of 11 KV TPMO Switch.
Filling of cable box O/D11 KV (3X120) sq mm. Complete in all respect.
Making Fancing
Making Plinth
Mounting of 100 KVA T/F On Plinth with all accessories as per RESPO norms.
Mounting of 25 KVA T/F On DP with all accessories as per RESPO norms.
Stringing and sagging of 2 wire of 8 SWG G.I. Wire.
Stringing and sagging of 2 wire of 6 SWG G.I. Wire.
Earthing of metering cubicle and DP unit.
Cable Box Making charges
Making cable jointing kit.
Carrage Material Instalation Charges TOP CHANNEL (3 No.), S/S BASE ANGLE (4 No.), MS ANGLE 50X50X6 MM (15 Kg.), X-ARM V-TYPE 11 KV (2 No.) Etc.
PROVIDED BY CONTRACTOR
HOLDING CLAMP V-X ARM & DROPPER
MS HOLDING CLAMP FOR ST POLE
NUT AND BOLT
F- CLAMP
Shre Bala Jee Enterprises (BID ID -5396069)
M/S Shukla Traders (BID ID -5396058)
M/S SUBHASH TRADERS (BID ID -5374052)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .