| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹1.1 L (1.01%)Admitted-Finance | ₹1.1 Cr+₹1.1 L (1.01%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI NACHIYAR CONSTRUCTIONS AND EARTH MOVERS L1 | VIJAYALAKSHMI RADHAKRISHNAN L2 |
|---|---|---|---|---|---|
| 1.001) Strengthening of Puthagaram Kudiyana Street Mayana Road Km 0/0 - 0/425 in Puthagaram Panchayat. | |||||
| 2.00 | Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete | 425 | Sq.m | 19.87 ₹8,444.75 Lowest | 20.07 ₹8,529.75 |
| 3.00 | Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete | 95.63 | Cu.m | 3,670.23 ₹3,50,984.09 Lowest | 3,707.31 ₹3,54,530.06 |
| 4.00 | Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete | 1,275 | Sq.m | 58.15 ₹74,141.25 Lowest | 58.74 ₹74,893.5 |
| 5.00 | (PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete | 1,275 | Sq.m | 303.33 ₹3,86,745.75 Lowest | 306.39 ₹3,90,647.25 |
| 6.00 | Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete | 19.13 | Cu.m | 839.09 ₹16,051.79 Lowest | 847.56 ₹16,213.82 |
| 7.00 | Provision for Name board & Photographic Charges | 1 | nos | 2,499.75 ₹2,499.75 Lowest | 2,525 ₹2,525 |
| 8.002) Strengthening of Andakudaiyan Keela Theru road Km 0/0 - 0/170 @ Malaiyappanallur Panchayat | |||||
| 9.00 | Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete | 170 | Sq.m | 19.87 ₹3,377.9 Lowest | 20.07 ₹3,411.9 |
| 10.00 | Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete | 38.25 | Cu.m | 3,566.2 ₹1,36,407.15 Lowest | 3,602.23 ₹1,37,785.3 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
24 Oct 2024, 3:00 pmClosed
Block development officer, Thiruvidaimarudur
Kaveri Moolai Street, Thiruvidaimarudur
1) Strengthening of Puthagaram Kudiyana Street Mayana Road in Puthagaram Panchayat. 2) Strengthening of Andakudaiyan Keela Theru road Malaiyappanallur Panchayat 3) Strengthening of Aattrankarai Theru road
2024_RDTN_494703_1
Rc.No.1504/2024/A2 dt.16-10-2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruvidaimarudur
Please refer tender documents
9 documents required · 9 mandatory
₹0
₹1.1 L
Yes
25 Oct 2024
18 Oct 2024
24 Oct 2024
18 Oct 2024
24 Oct 2024
18 Oct 2024
Amount
1) Strengthening of Puthagaram Kudiyana Street Mayana Road Km 0/0 - 0/425 in Puthagaram Panchayat.
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
2) Strengthening of Andakudaiyan Keela Theru road Km 0/0 - 0/170 @ Malaiyappanallur Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
3) Strengthening of Aattrankarai Theru Road Km 0/0 - 0/200 @ Malaiyappanallur Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
4) Strengthening of Thukkatchi Muslim Street Road Km 0/0 - 0/291 @ Thukkatchi Panchayat
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
5) Strengthening of Muslim Theru road Km 0/291 - 0/378 @ Thukkatchi Panchayat
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
6) Strengthening of Panthi Kudiyana BG Road Km 0/0 - 0/400 @ Thirucherai Panchayat
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
7) Upgradation of Panthi Atrangarai BG Road Km 0/0 - 0/151 @ Thirucherai Panchayat
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
8) Upgradation of Udaiyar Pudhu Street Road Km 0/0 - 0/056 @ Thirucherai Panchayat
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
9) Strengthening of Pookkara Street Road Km 0/0 - 0/320 @ Mathur Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
10) Strengthening of Pookkara street road Km 0/320 - 0/495 @ Mathur Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
11) Strengthening of Serukudi Indra Nagar 1st Main Road Km 0/0 - 0/281 @ Kothangudi Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
12) Strengthening of Thendral Nagar 1st Cross Road Km 0/0 - 0/201 @ Natchiyarkoil Panchayat
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
13) Strengthening of Thendral Nagar 2nd Cross Road Km 0/0 - 0/162 @ Natchiyarkoil Panchayat
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
14) Strengthening of Puthu Theru Road Km 0/0 - 0/213 @ Semmangudi Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
15) Strengthening of Chekkadi Theru Road Km 0/0 - 0/086 @ Semmangudi Panchayat
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
16) Strengthening of Vadakku Moolangudi Pillaiyarkoil Street Road Km 0/0 - 0/435 @ Vittalur Panchayat
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
17) Strengthening of Serukudi Indra Nagar 2nd Main Road Km 0/0 - 0/090 @ Kothangudi Panchayat
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing & laying WBM Grade III to a compacted thickness of 75 mm thick using 1 cum of 63 mm - 11.2 mm IRC size HBG metal with 0.24 cum of US Gravel of blindage per 10 sqm including cost, conveyance charges for all materials , labour charges, stacking charges, spreading charges, hand packing to proper camber, watering with all leads, compacting with 80 to 100 kN power roller including hire & feul charges for power roller and all other tools and plants employed etc complete
Providing Tack Coat over WBM surface using 4 kg of Bituminious Emulsion including cost of emulsion, labour charges for applyins tack coat etc complete
(PREMIX CARPET WITH SEAL COAT TYPE ' A ' Plastic road 8% in OGPC only& not in Sealcoat.) Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for Mini Hot Mix Plant, bitumen boiler, all other tools and plants employed etc., complete
Providing Gravel Soling to Both Sides of the road including cost of gravel , conveyance charges, stacking charges, spreading & compacting charges etc complete
Provision for Name board & Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIJAYALAKSHMI RADHAKRISHNAN (BID ID -1170014)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_587783.xls
BOQ • 0.34 MB
Pkg-01-PB.pdf
Tender Documents • 0.29 MB
Pkg-01-TB.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .