| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | L1 | Accepted-Finance L1 Accept | |
| 2 | L2₹4.9 L+₹3,060.27 (0.63%)Rejected-Finance | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | R. KUMAR L1 | T MANOGARAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter at near to Govt. Arts College in Perunavalur Panchayat | |||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B. | 12.02 | cum | 263.5 ₹3,167.27 Lowest | 265 ₹3,185.3 |
| 3.00 | Filling with M.sand including cost and conveyance of sand to work site including all labour charges for filling etc complete. | 3.73 | cum | 2,165.5 ₹8,077.32 Lowest | 2,170 ₹8,094.1 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 4.66 | cum | 6,007 ₹27,992.62 Lowest | 6,010 ₹28,006.6 |
| 5.00 | RCC 1:1.5:3 mix using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 9.64 | cum | 9,905 ₹95,484.2 Lowest | 9,910 ₹95,532.4 |
| 6.00 | Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete. | 55.85 | sqm | 547.5 ₹30,577.88 Lowest | 550 ₹30,717.5 |
| 7.00 | Supplying and fabrication of steel including cost and conveyance and all labour charges etc., complete. | 770 | KG | 91.8 ₹70,686 Lowest | 95 ₹73,150 |
| 8.00 | Brick Work in Cement Mortor 1:5 mix using courntry bricks including cost and conveyance of all materials to site and all labour charges etc., complete | 12.5 | cum | 6,384.5 ₹79,806.25 Lowest | 6,385 ₹79,812.5 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 16.98 | sqm | 308.5 ₹5,238.33 Lowest | 310 ₹5,263.8 |
| 10.00 | Plastering Inside& outside with cement mortor 1:5 mix 12mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete | 87.91 | sqm | 291 ₹25,581.81 Lowest | 295 ₹25,933.45 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
2 Mar 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Bdo,Avudaiyarkoil
Pt.union Office,Avudaiyarkoil
Construction of Bus Shelter at near to Govt. Arts College in Perunavalur Panchayat
2026_RDTN_666260_1
Avk/MLACDS/Perunavalur/Work
Open Tender
Civil Works
Item Rate
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
14 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
2 Mar 2026
25 Feb 2026
Construction of Bus Shelter at near to Govt. Arts College in Perunavalur Panchayat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per ss 20 B.
Filling with M.sand including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
RCC 1:1.5:3 mix using 20mm ISS BG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for Sides and soffits including cost and conveyance and all labour charges etc., complete.
Supplying and fabrication of steel including cost and conveyance and all labour charges etc., complete.
Brick Work in Cement Mortor 1:5 mix using courntry bricks including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering Inside& outside with cement mortor 1:5 mix 12mm thick including cost of conveyance of all materials to work site and all labour charges etc., complete
Supplying and Fixing of ceramic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and Fixing of Glaized Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
White washing 2 coats with shell lime including cost and conveyance of all labour charges etc., complete.
Distembering two coats with best approved colur in cluding all labour charges etc complete
Exterior Emulsion Two coats Painting including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 15 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Avk_docPerunavalurBus.pdf
Tender Documents • 0.18 MB
BOQ_800291.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .