| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹17.2 L+₹47,359.50 (2.84%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹17.3 L+₹61,490.98 (3.68%)Rejected-AOC | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | T.THIRUPATHI L2 | DEVANSH CONTRACTOR L1 | Alagesan Contractor L3 |
|---|---|---|---|---|---|---|
| 1.001. Construction of a 3M Span RCC Slab Culvert at Jogirkottai Village road H/o. Billanakuppam. Estimate Amount : 990000/- | ||||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 68.69 | Cum | 262.94 ₹18,061.35 | 220 ₹15,111.8 Lowest | 265.1 ₹18,209.72 |
| 3.00 | Cement concrete 1:4:8(one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers . | 10.18 | Cum | 5,280.12 ₹53,751.62 | 4,800 ₹48,864 Lowest | 5,323.56 ₹54,193.84 |
| 4.00 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 82.83 | Cum | 5,549.26 ₹4,59,645.21 | 5,150 ₹4,26,574.5 Lowest | 5,594.91 ₹4,63,426.4 |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel. | 177.3 | Sqm | 546.74 ₹96,937 Lowest | 650 ₹1,15,245 | 551.24 ₹97,734.85 |
| 6.00 | Deck Slab | 22.5 | Sqm | 1,093.49 ₹24,603.53 | 590 ₹13,275 Lowest | 1,102.49 ₹24,806.03 |
| 7.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification. | 3.9 | Cum | 6,567.04 ₹25,611.46 Lowest | 7,200 ₹28,080 | 6,621.06 ₹25,822.13 |
| 8.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 0.8 | Mt | 91,564.55 ₹73,251.64 | 89,000 ₹71,200 Lowest | 92,317.79 ₹73,854.23 |
| 9.00 | Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or | 8.1 | Cum | 8,879.39 ₹71,923.06 | 7,600 ₹61,560 Lowest | 8,952.44 ₹72,514.76 |
| 10.00 | Provision for Bitumen Pad | 4.5 | Sqm | 223.6 ₹1,006.2 Lowest | 560 ₹2,520 | 225.44 ₹1,014.48 |
Tender Value
₹17.4 L
EMD Value
₹18,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT Veppanapalli Block 2 Works under DMFT 2025-2026 Construction of RCC slab culverts at Billanakuppam Panchayat Package No 25 DMFT 2025-2026
2026_RDTN_652372_1
RocNo_15_2026_Mines_03_02_2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Veppanapalli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
DRDA Krishnagiri
24 Mar 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
10 Feb 2026
1. Construction of a 3M Span RCC Slab Culvert at Jogirkottai Village road H/o. Billanakuppam. Estimate Amount : 990000/-
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8(one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel.
Deck Slab
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or
Provision for Bitumen Pad
Provision for Weep Holes
Provision for Name board
2. Construction of RRC - Slab Culvert 2.0M Span at 0/2 of Vasanthapalli - Jeenur road to Pambukaran Kottai H/o. Billanakuppam. Estimate Amount: 750000/-
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8(one cement, four sand, and eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers .
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel.
Deck Slab
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specification.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or
Provision for Bitumen Pad
Provision for Weep Holes
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
PBRoads25.pdf
Tender Documents • 0.35 MB
BOQ_782235.xls
BOQ • 0.36 MB
TBRoads25.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .