Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | D₹10.5 LAccepted-AOC | D | Accepted-AOC 1st lowest | |
| 2 | D₹11.6 LRejected-AOC VILL CHALAWAT P O BHADAWLI TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | D | Rejected-AOC 2nd lowest | |
| 3 | D₹17.4 LRejected-AOC HIMACHAL PRADESH HP | D | Rejected-AOC 4th lowest | |
| 4 | D₹18.7 LRejected-AOC V P O LABANA SADANA TEHSIL RAMPUR DISTT SHIMLA H P | LABANA SADANA | SHIMLA | HIMACHAL PRADESH | D | Rejected-AOC 3rd lowest |
Tender Value
Refer Docs
EMD Value
₹17,000
Closing Date
16 Mar 2021, 9:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Rampur
EE B and R Division HPPWD Rampur
SH ROFD and C.O R.Wall at various RDs
2021_PWD_45408_1
PW/RMP/2020-18116-18 Dated 24.02.2021
Open Tender
Civil Works - Roads
Item Rate
EE B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
Yes
EE Rampur
₹17,000
Yes
13 Dec 2021
10 Mar 2021
16 Mar 2021
10 Mar 2021
16 Mar 2021
10 Mar 2021
10 Mar 2021 - 16 Mar 2021
90 days
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting /excavation, including rock excavation shall be carried out true to lines, grades , side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification for Rural Road, August, 2004 and clause 16.2 of General Conditions for Contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner including arrangement of dumping site, trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery for stones, whether useful or not, for 167.31 cum @ Rupees 170/= only (Rupees one hundred seventy only) per cubic metre shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Excavation for structures:- Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone 40mm agregate nominal size) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803, 1202 and 1203.including carriage of material within all leads and lifts and as per HP.PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge.
Providing and Laying concrete for plain/reinforced concrete 1:5:10 with 40 mm nominal size aggregate in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including carriage of material within all leads and lifts and as per HP.PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge.
Providing and laying of boulder apron laid in wire crates with 4mm dia G.I. wire conforming to IS:280 and IS: 4826 in 100mmx100mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing and technical specifications Clause 1301 including carriage of material within all leads and lifts and as per HP.PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of material within all leads and lifts and as per HP.PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including carriage of material within all leads and lifts and as per HP.PWD. specification of 1990 volume-I and as per direction of Engineer-in-Charge.
Anup.constrction
AJAY KUMAR
JAGDISH KUMAR GOVT. CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .