| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC KARMULLAPUR BHAGGADWA BAZAR BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹18.6 L | L1 | Accepted-AOC Financial bid is accepted at the price Rs 1862670.37 the Employer |
| 2 | L2₹19.1 LRejected-Finance C 2 411 VIBHAV KHAND GOMTI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹19.1 L | L2 | Rejected-Finance Being higher rate rejected |
| 3 | L3₹20.1 LRejected-Finance 628 336 SHAKTI NAGAR INDIRA NAGAR LUCKNOW | LUCKNOW | ₹20.1 L | L3 | Rejected-Finance Being higher rate rejected |
| 4 | L4₹20.5 LRejected-Finance SECTOR 1 ADARSH NAGAR MISHRA COLONY DISTRICT SITAPUR | SITAPUR | UTTAR PRADESH | 261001 | ₹20.5 L | L4 | Rejected-Finance Being higher rate rejected |
| 5 | L5₹21.0 LRejected-Finance 0 JANTA COLONY LAKHOLI RAJNANDGAON CHHATTISGARH 491441 UDYAM CG 15 0004617 | RAJNANDGAON | CHHATTISGARH | 491441 | ₹21.0 L | L5 | Rejected-Finance Being higher rate rejected |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
27 Jan 2026, 12:00 pmClosed
Executive Engineer PD PWD Sitapur
Office of the Executive Engineer PD PWD Sitapur
Special Repair of Dugana Link Road
2026_CEUCZ_1107356_4
138/E-TENDER/2025-26 DT. 08.01.2026
Open Tender
Civil Works - Roads
60 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹2.8 L
Yes
Office of the Executive Engineer PD PWD Sitapur
13 Feb 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
27 Jan 2026
19 Jan 2026
23 Jan 2026
Providing, Laying, spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate, watering and compacting to the required density G-III (Mord 4.7(3)(A))
Providing and applying tack coat with VG_10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom.
Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat .
Providing and laying seal coat 'C' Type sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall .
Construction of Patri with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.28 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.
Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203
Providing PCC M20 Architectural Coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clause 615
Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/ superstracutre as per technical specification clauses 613.4 & 1204
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_2043805.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid