| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-2₹11.3 L+₹1,500 (0.13%)Accepted-AOC | L-2 | Accepted-AOC ACCEPTANCE | |
| 2 | L-1₹11.3 LRejected-Finance PRAYAGRAJ | UTTAR PRADESH | 211001 | L-1 | Rejected-Finance NOT INTERESTED | |
| 3 | L-3₹11.4 L+₹4,700 (0.42%)Rejected-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | L-3 | Rejected-Finance L-3 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
19 Feb 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE LID MUMFORGANJ PRAYGRAJ
EE LID MUMFORGANJ PRAYGRAJ
Repairing of 750 KW 1005 H.P.,3.3 KV Crompton Make H.T. Motor No. 10 by Rewinding and Insulation of Overheated Coil of motor at YPC-I
2021_UPIDM_555171_1
132/LID/NIVIDA/PRAYAGRAJ DT.02-02-2021
Open Tender
Civil Works - Lift Irrigation Scheme
Item Rate
30 days
yamuna pump nahar stage-1
pls refer documents
2 documents required · 2 mandatory
₹770
EE LID MUMFORDGANJ
₹1.1 L
24 Feb 2021
13 Feb 2021
19 Feb 2021
13 Feb 2021
19 Feb 2021
13 Feb 2021
90 days
Amount
Shifting of motor No.10 from foundation to working place, Dismantling by taking out rotor from stator, checking of bearings, cleaning stator with overhead braidings & drying it by heating up to completion.Taking out bearing cleaning, degreasing making thread on shaft providing GM lock nut washer assembly alignment etc.(1)Driving End(D.E)(2)Non Driving End(NDE)Taking out overheated / damaged coil from stator safely.Insulation of coil by removing damaged insulation and then proper insulate with H class Insulating material like capton tape, Nomex tape, polyester mica tape, capton mica tape, glass tape and epoxy rasin as required. Rewinding of H.T. stator by inserting 60 Nos. coil in stator wedging of coil by polyester chord of suitable size etc. Connecting coil together with silver brazing rod and insulation overhead braiding. Spray Varnishing of H.T. Stator & Rotor with varnish i.e. Dr Beck/ Grey & Delco &,XY Resing ,then Reheating to achieve required dryness & I.R. value Taking out bearing cleaning, degreasing,greasing,assembling and alignment including cost of superior quality of grease.(1)Driving End(D.E)(2)Non Driving End(NDE)Replacing motor service connection lead (copper) including and connection Reassembling of motor, shifting from working place to foundation, installation & testing on No. load for 24 hrs and then testing on load condition to run 60 cusec Pump ,Alignment of motor No.10 with pump radially and axially both by using S.S. Shims, rubber coupling bushes etc as required Complete in all respect None of T&P/Stock /POL items shall be provided by the Department . Note :Final Report of motor shall be given after successful running of 2000 hrs/ 06 month.
R M ENTERPRISES
Krishna Construction Company
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .