Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.0 LAccepted-Finance R O VILL HASOL P O CHUKHATH TEHSIL JAWALAMUKHI DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹5.0 L | L-1 | Accepted-Finance accepted |
| 2 | L-2₹5.6 LRejected-Finance VPO BANIKHET TEHSIL DALHOUSIE DISTT CHAMBA HP | ₹5.6 L | L-2 | Rejected-Finance rejected |
| 3 | L-3₹6.1 LRejected-Finance | ₹6.1 L | L-3 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | Rajeev Thakur L2 | M/S Satya Dev L3 | VIKAS THAKUR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work in all classification of earth work such as pick work, jumper work, saturated soil, blasting soft/ hard rock or chiselling, soft/ hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of beds to correct grades including shoring, strutting, planking, timbering where ever required, stacking the usable/ serviceable materials/soil separately complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | 19.71 | Cum | 420 ₹8,278.20 | 430 ₹8,475.30 | 410 ₹8,081.10 |
| 2.00 | Excavation in earth work and disposal of all excavated earth up to all leads and lifts, disposed earth to be levelled neatly dressed as per direction and to the entire satisfaction of the Engineer-in-Charge. | 0.77 | Cum | 530 ₹408.10 | 550 ₹423.50 | 500 ₹385 |
| 3.00 | Excavation in foundation trenches etc.(for pipes & pits upto all depth) in earth work in all classification of earth work such as pick work, jumper work, saturated soil , blasting soft/hard rock or chiselling soft/ hard rock including wedging out of a rock where blasting is prohibited in all lifts including trimming and dressing of sides levelling of beds to correct grades including shoring, strutting, planking, timbering and dewatering where ever required, stacking the serviceable/unserviceable materials/soil separately and after laying and jointing of pipes, returning the usable soil in trenches in 15 CM layers including consolidation of each deposited layers by ramming and watering and then dispositng of all surplus excavated soil, useable materials as directed within all leads/lifts including restoration of metalled surfaces to its original condition and including cost of diversion for traffic night signals, fixing caution boards, crossing over trenches for access to houses fencing etc. complete in all respect within all leads and lifts as per the direction of Engineer-in-Charge. | 35.19 | Cum | 650 ₹22,873.50 | 700 ₹24,633 | 610 ₹21,465.90 |
| 4.00 | Providing and laying cement concrete 1:5:10 ( 1 cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect with in all leads & lifts and as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 3 | Cum. | 9,000 ₹27,000 | 9,050 ₹27,150 | 8,950 ₹26,850 |
| 5.00 | Providing and laying cement concrete 1:4:8(1Cement: 4Sand: 8Graded stone agg.40mm nominal size)& curing complete excluding cost of form work in foundation and plinth as per direction & to the entire satisfaction of the Engineer-in-Charge with in all leads and lifts . | 3.13 | Cum. | 1,100 ₹3,443 | 1,150 ₹3,599.50 | 1,050 ₹3,286.50 |
| 6.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) | ||||||
| 6.01 | In suspended floor roofs ,landing and shelves and their support.balconies , beams,girders, bressumers and contilever up to floor two level with in all leads and lifts. | 1.83 | cum | 12,000 ₹21,960 | 12,050 ₹22,051.50 | 11,500 ₹21,045 |
| 7.00Providing and laying cement concrete 1 : 1.5 :3(1 cement :1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcemnt for reinforced concrete work complete in all respect with in all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge . | ||||||
| 7.01 | Foundation,footing,bases of columns and the like & mass concrete. | 3.15 | cum | 11,800 ₹37,170 | 12,000 ₹37,800 | 11,500 ₹36,225 |
| 7.02 | Walls (any thickness but not less than 0.10m thickness) attached pillaster, buttresses, plinth & string courses etc from top of foundaation level upto floor two level as per the direction & to the entire satisfaction of the Engineer-in-Charge. | 6.58 | cum | 12,000 ₹78,960 | 12,500 ₹82,250 | 11,800 ₹77,644 |
Tender Value
₹4.7 L
EMD Value
₹9,335
Closing Date
24 Oct 2025, 5:00 pmClosed
EE Rampur
JSD Rampur
Restoration of rain damages to WSS Nankhari
2025_HPIPH_118079_1
No.EE-JSD-RMP-E-ten/-7005-55 dt 15.10.2025
Open Tender
Civil Works
90 days
Nankhari
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹9,335
19 Feb 2026
17 Oct 2025
25 Oct 2025
17 Oct 2025
24 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
F6.pdf
Tender Documents • 0.67 MB
TC.pdf
Tender Documents • 0.14 MB
F8.pdf
Tender Documents • 1.09 MB
BOQ_172713.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid