| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | ₹9.6 L | L1 | Admitted-Finance |
| 2 | L2₹12.7 L+₹3.1 L (32.3%)Admitted-Finance AT GURUDWARA NEAR UCO BANK PO SOUTH BLANDA TALCHER DIST ANGUL | TALCHER | ANGUL | ODISHA | 759116 | ₹12.7 L+₹3.1 L (32.3%) | L2 | Admitted-Finance |
| 3 | L3₹14.6 L+₹5.0 L (51.6%)Admitted-Finance PLOT NO 733 BIJIPUR HOUSE NO 2 TAMANDO VILLAGE TOWN SPRINGVILLE GREEN CITY BHUBANESWAR KHORDHA ODISHA 752054 INDIA | KHORDHA | ODISHA | 752054 | ₹14.6 L+₹5.0 L (51.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Evergreen Electrical Works L2 | yashrishi engineering L1 | UNIVERSAL PROJECT AND MAINTENANCE L3 |
|---|---|---|---|---|---|---|
| 1.00Dismantling and erection of RCC civil structure for VCB installation | ||||||
| 2.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
16 inchx16 inchx42 inch=0.17 cumx4 pillar=0.682 cum; For 8 VCB= 8*0.682=5.462 | 5.46 | CUM | 3,000 ₹16,386 | 1,701.66 ₹9,294.49 Lowest | 2,450 ₹13,381.9 |
| 3.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)= 5 ftx4ft3ft= 1.7 cum slbx8 vcbs= 13.6 cu.m for upholding the 160 inch height tower structure | 13.6 | CUM | 7,500 ₹1,02,000 | 5,747.42 ₹78,164.93 Lowest | 8,570 ₹1,16,552 |
| 4.00 | Carriage of materials (building rubbish) capacity 8 cu.m per trip- 2 km | 1 | Trip | 177 ₹177 | 94.51 ₹94.51 Lowest | 140 ₹140 |
| 5.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing
complete.- 1 cu.m per VCB | 8 | cum | 1,000 ₹8,000 | 746.32 ₹5,970.58 Lowest | 1,145 ₹9,160 |
| 6.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. – 1.5 Cum per VCB=1.5*8=12 cu.m | 12 | cum | 235 ₹2,820 | 177.94 ₹2,135.28 Lowest | 260 ₹3,120 |
| 7.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(for covering trenches with steel plates) | 480 | kg | 135 ₹64,800 | 101.68 ₹48,806.4 Lowest | 155 ₹74,400 |
| 8.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 8.46 | sq.mtr | 50 ₹423 | 39.69 ₹335.76 Lowest | 63 ₹532.98 |
| 9.00 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m | 4 | mtr | 275 ₹1,100 | 210.21 ₹840.83 Lowest | 333 ₹1,332 |
| 10.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. cum 910.15 | 3.3 | cum | 1,000 ₹3,300 | 746.32 ₹2,462.87 Lowest | 1,183 ₹3,903.9 |
Tender Value
₹13.8 L
EMD Value
₹17,300
Closing Date
15 May 2026, 5:00 pmClosed
Anilkumar KS Staff Officer(EnM) Lakhanpur Area
Anilkumar KS Staff Officer(EnM) Lakhanpur Area GM Office Bandhabahal Dist-Jharsuguda Odisha-768211 Mob-7987258691
Dismantling of existing 33KV CT , 33 KV MOCB , Erection of civil infrastructure for the new VCBs and Re-Erection with new 33 KV CT, 33 KV VCB and associated works at 132/33kV central substation , Jorabaga, Lakhanpur Area, MCL.
2026_MCL_358896_1
MCL/LKPA/EnM/eNIT/26-27/45, Dt-29.04.2026
Open Tender
Electrical and Maintenance Works
Item Rate
75 days
132 KV CSS Jorabaga
Please refer Tender documents.
5 documents required · 5 mandatory
₹17,300
13 Jul 2026
29 Apr 2026
18 May 2026
29 Apr 2026
15 May 2026
30 Apr 2026
29 Apr 2026 - 4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and erection of RCC civil structure for VCB installation | - | - | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge
16 inchx16 inchx42 inch=0.17 cumx4 pillar=0.682 cum; For 8 VCB= 8*0.682=5.462 | 1 | CUM | 1 | ₹1 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)= 5 ftx4ft3ft= 1.7 cum slbx8 vcbs= 13.6 cu.m for upholding the 160 inch height tower structure | 1 | CUM | - | - |
| 4 | Carriage of materials (building rubbish) capacity 8 cu.m per trip- 2 km | - | Trip | - | - |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing
complete.- 1 cu.m per VCB | - | cum | 1 | - |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. – 1.5 Cum per VCB=1.5*8=12 cu.m | - | cum | - | - |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(for covering trenches with steel plates) | - | kg | - | - |
| 8 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | - | sq.mtr | 1 | - |
| 9 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m | - | mtr | - | - |
| 10 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. cum 910.15 | 1 | cum | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.80 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_371766.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .