Loading…
Loading…
Tender Value
₹60.8 L
EMD Value
₹1.2 L
Closing Date
8 Oct 2026, 3:00 pm
The Chief Engneer, Chennai Port Authority
No.1Rajaji Salai, Opposite to RBI,ChPA, Chennai1
TENDER FOR ANNUAL MAINTENANCE CONTRACT FOR HORTICULTURAL AND PLANTATION FOR THE ENTIRE HORTICULTURAL AREA OF CHENNAI PORT
2026_ChPT_926824_1
T/WMA2/24/2026/E
Open Tender
Civil Works
Percentage
365 days
Chennai Port Authority premises
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.2 L
Yes
18 Sept 2026
18 Sept 2026
9 Oct 2026
18 Sept 2026
8 Oct 2026
2 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Transporting/ Removing of garden waste by TATA 407 / Tractor or equivalent including collecting, loading, transporting the broken / fallen trees and Garden waste from lawns/ Gardens, etc., loading/unloading and carriage complete disposal wherever required in port premises and dumping the same in dumping yard with in a lead of 2 km / 4 KM / 6KM all as directed including cost of all labour, tools, hire charges for machineries, fuel , mobile oil, etc., complete.,
a) lead upto 2KM | 600 | Trips | 646.45 | ₹3,87,870 |
| 2 | b) lead upto 4KM | 225 | Trips | 756.15 | ₹1,70,133.75 |
| 3 | c) lead upto 6KM | 135 | Trips | 854.9 | ₹1,15,411.5 |
| 4 | 2. Loading ,transporting and placing the required flower pots / Tree plants/ plantation related items from nursery to wherever necessary for port function including return trip in the Port premises as directed, including all labour, tools, hire charges for machinery, fuel , etc., complete.
a) lead of 3 KM | 40 | Trips | 702.85 | ₹28,114 |
| 5 | b) lead of 7 Km | 20 | Trips | 898.9 | ₹17,978 |
| 6 | 3.Pruning, trimming, shaping of trees /shrubs (ht. 15 feet and above) including removal of cut materials upto 50m lead wherever necessary as directed including cost of all labour, tools and plants, equipments, hire charges for machinery, fuel , safety appliances, etc., complete.
Note : Necessary Tools and plants etc., shall be arranged by the contractor | 1,500 | No | 138.25 | ₹2,07,375 |
| 7 | 4.Trenching/ earthwork excavation in ordinary soil, sand, clay mixed with roots, boulder, debris, rubbish etc upto a depth of 60 cm or as required, for planting tree/shrubs saplings including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water, including all labour, tools, equipments etc. complete.
Note: Payment for Red earth, / red earth mixed with sludge or manure will be paid seperately under relevant item. | 40 | Cum | 113.95 | ₹4,558 |
| 8 | 5.Supplying and stacking of red earth free from stones and unwanted materials and stocked wherever required inside the port premises during the entire period of contract all as directed at site including cost of all labour, materials, fuel, tools, transport, etc., complete.
Note:
(i).20% of voids will be deducted from the stacked red earth to arrive the quantity.
(ii). Payment will be made based on the quantity after deduction of 20% of voids. | 20 | Cum | 769.7 | ₹15,394 |
| 9 | 6.Supplying and stacking of dried cattle manure(Screened through sieve of I.S. designation 4.75 mm) free from leaves, and other unwanted materials and stocked wherever required inside the port premises during the entire period of contract all as directed at site including cost of all labour, materials, fuel, tools, transport, etc., complete.
Note:
(i) 8% of voids will be deducted from the stacked cattle manure to arrive the quantity.
(ii) Payment will be made based on the quantity after deduction of 8% of voids. | 20 | Cum | 470.8 | ₹9,416 |
| 10 | 7.Mixing of stacked red earth and cattle manure in the required proportion 1:1(one part of red earth: 1 part of cattle manure) including compacting and all as directed at site including cost of all labour, tools and plants, etc., complete | 40 | Cum | 53.35 | ₹2,134 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.67 MB
TDHorti.pdf
Tender Documents • 2.83 MB
BOQ_973970.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .