Tender Value
₹2.1 L
EMD Value
₹10,595
Closing Date
29 Sept 2026, 6:55 pm2d left
EXECUTIVE ENGINEER REW BUDGAM
RDD COMPLEX BUDGAM
Construction of Culvert near H/O Rashid Baba at Bustor Khah Nallah at Ramhama Phase-II
2026_RDPR_324913_21
NIT_73_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
WATERHAIL
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹10,595
Yes
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 14.04 | Cum | 479.3 | ₹6,729.37 |
| 2 | P/L Stone soling, Nallah Boulders Hand packed including carraige ( av lead 10 kms) | 7.14 | Cum | 1,266.21 | ₹9,040.74 |
| 3 | Plain Cement Concrete M7.5 (1:4:8 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 | 1.56 | Cum | 5,202.9 | ₹8,116.52 |
| 4 | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate (including carriage of all materials) | 19.19 | Cum | 5,733.6 | ₹1,10,027.78 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N. size) | 2.34 | Cum | 7,104.35 | ₹16,624.18 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 93.6 | kg | 123.2 | ₹11,531.52 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 54.6 | Sqm | 286.35 | ₹15,634.71 |
| 8 | Carriage of materials by mechanical transport a) Coarse Aggregate av lead 15 kms | 20.55 | No | 344.49 | ₹7,079.27 |
| 9 | Carriage of materials by mechanical transport a) Fine Aggregate av lead 15 kms | 10.39 | No | 344.49 | ₹3,579.25 |
| 10 | cost and carraige of 36'' dia RCC Pipes inc laying etc compelte job | 1 | job | 18,500 | ₹18,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1096483.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .