Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹53.7 L
EMD Value
₹1.1 L
Closing Date
4 Aug 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Providing and laying 50 mm thick Bituminous Macada
Providing and laying 50 mm thick Bituminous Macadam and 25 mm thick SDBC on Maggar Khad to Kuke Chak road in Km 1st to 2nd and Indira Colony link road.
NIT
2020_PWDJK_100687_1
e-NIT No. 37of 2020-21/3477-84/G,Dtd-15-07-20
Open Tender
Civil Works - Roads
Item Rate
30 days
Kathua
BOQ
6 documents required · 6 mandatory
₹1,000
Yes
Providing and laying 50 mm thick Bituminous Macada
₹1.1 L
Yes
8 Aug 2020
18 Jul 2020
5 Aug 2020
18 Jul 2020
4 Aug 2020
18 Jul 2020
90 days
Amount
Providing , laying, spreading and compacting graded stone aggregate Wet Mix Macadam specifications including premixing the material with water at OMC in Mechanical Mix plant, carriage of mixed material by Tipper to site, laying in uniform layers with paver in sub base/base on well prepared surfaces & compacting with vibrator roller to achieve the desired density , finished work to be measured including all leads, lifts and carriage of material by MT / H.L. (conforming to clause 406 of MORT&H specifications).
Providing and laying 50 mm thick (compacted) premix bituminous macadam base course with stone aggregate of quality size and grading as specified in latest MORT&H specifications and straight run bitumen of VG-30 @ 4% by weight of total mix including Hot mixing of stone aggregates and bitumen in Hot Mix Plant, Transporting mixed material to the site and laying with paver finisher as per required profile, inclu. cost of priming/tack coat in required level and grade, rolling with power road roller 8 to 10 tonne capacity to achieve the required compaction and density, All complete including cost of bitumen and all sort of taxes.
Providing and laying of 25 mm thick Semi Dense Bituminous concrete using 2.25 cum and 1.12 cum of stone chipping of 13.2mm size & 11.2 mm size respectively for 100 sqm, 52 kg & 56 kg of hot bitumen grade 80/100 per cum of stone chippings of 13.2 mm and 11.2mm size respectively compacted with road roller of 6 to 9 tonne capacity incl.preparation of road surface as per specification and then laying of a tack coat with hot straight run bitumen @ 0.75 Kg /Sqm on WBM surface & 0.50 Kg per Sqm on existing BT surface incl. transporting mixed material and laying to the required level and grade & finally the surface finished with a seal coat of premixed fine agg. using bitumen @ 128Kg /cum of the fine agg. & 0.60 cum of fine agg. per 100 sqm of road surface incl. rolling , finishing & carriage, scarifying and cleaning complete job (conforming to clause 511 & 513 of MORT & H specifications) incl. cost of bitumen.
Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material , labour all leads , lifts and carriage of material by MT/HL. ( for berm filling)
SHIV HOT MIX PLANT
PEER BABA ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .