| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.3 CrAdmitted-Finance GROUND FLOOR SURAJ APPARTMENT STATION ROAD PARMANANDPUR PO BHAWANIPATNA DIST KALAHANDI ODISHA 766001 | BHAWANIPATNA | KALAHANDI | ODISHA | 766001 | L1 | Admitted-Finance | ||
| 2 | L2₹14.9 Cr+₹57.9 L (4.06%)Admitted-Finance AT PO BANGOMURDA DIST BALANGIR ODISHA | BANGOMURDA | BALANGIR | ODISHA | L2 | Admitted-Finance | ||
| 3 | L3₹15.9 Cr+₹1.6 Cr (11.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹17.0 Cr+₹2.7 Cr (18.8%)Admitted-Finance AT POST BANGOMUNDA DIST BALANGIR 767040 | BALANGIR | BALANGIR | ODISHA | 767040 | L4 | Admitted-Finance | ||
| 5 | L5₹17.1 Cr+₹2.8 Cr (19.4%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹15.9 Cr
EMD Value
₹15.9 L
Closing Date
19 Feb 2024, 5:00 pmClosed
Chief Engineer Buildings and Bridges
Office of EIC RW Odisha Bhubaneswar
Construction of bridge over Sundar Nallah on Palaskhand to Sriram PS road in the district of Bolangir under BSY for the year 2023-24
2024_CERWI_100910_8
Tender Online-13/2023-24 (Bridges)
National Competitive Bid
Civil Works - Bridges
Percentage
607 days
Bolangir
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹15.9 L
Yes
16 Mar 2024
10 Feb 2024
20 Feb 2024
10 Feb 2024
19 Feb 2024
10 Feb 2024
10 Feb 2024 - 17 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of overburdern soil for bridge works in all kinds of soil, by mechanical means & utilising the surplus earth locally for road work where ever required, back filling the excavated earth to the extent required complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 0.4 | Cum | 193.6 | ₹77.25 |
| 2 | Earthwork in excavation for bridge works in hard and compacted sheet rock within all leads & lifts including shoring, shuttering, propping bullahs,piling, dewatering from the foundation ,supply & working of pumps, stcking the excavated materials away from the work site etc complete in all respect as per approved drawing and technical specifications Section 900 and Clause 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. | 0.4 | Cum | 1,263.85 | ₹504.28 |
| 3 | Providing, driving and installing bored cast in situ RCC pile of grade M-35 of specified grade of following diameter for bridges to carry a safe load not less than specified excluding cost of steel liner & reinforcement steel but including length of pile to be embedded in pile cap etc complete, as per section 900, 1000, 1100, 1500 ,1600 & 1700 of MORT&H specifications for Road and Bridge works of (5th Revision) & Direction of Engineer-in charge.(1200mm dia RCC pile) | 0.6 | Rmt | 10,386.83 | ₹6,232.1 |
| 4 | Providing fitting, fixing 8 mm thick permanent steel liner plate for pile including cost of all materials,labour, for cutting, bending, welding installation all required T&P and machinery etc. complete as per section 1100,1900 of MORT& H specification for Road and Bridge works of (5th Revision) & Direction of Engineer-in charge. | 1 | MT | 1,00,083.54 | ₹99,983.46 |
| 5 | Driving steel liner of approved diameter in pile foundation complete as per drawing and technical specification, including cost of all materials, labour, T&P etc complete in all respect and as per section 1100 of MORT&H specifications & direction of the Engineer-in-charge. | - | Rmt | 907.63 | - |
| 6Providing Plain Cement concrete (1:3:6) mix with crushed stone aggregate of 4cm nominal size mechanically mixed ,placed in foundation & below approach slab compacted by vibrator, providing groove & beads where necessary including curing, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance royality & taxes of all material required for the work including supplying & working pumps, T&P articles finishing the exposed surface smooth as per section 2100 of MoRT&H specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. | |||||
| 6.01 | Foundation | 1 | Cum | 5,461.01 | ₹5,455.55 |
| 7Providing and laying Plain cement concrete of grade M-15 below pile cap of bridge works, below approach slab, etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate with formwork as per Section 900,1000,1500,1600,1700, 2100 & 2200 of MORT&H specifications for Road and Bridge works of (5th Revision) as per direction of the Engineer-in-charge. | |||||
| 7.01 | Foundation | 0.4 | Cum | 5,438 | ₹2,175.2 |
| 7.02 | Above Bed | - | Cum | 5,502.76 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_492017.xls
BOQ Document • 0.30 MB
139254990.pdf
Tender Document • 1.19 MB
DTCN-18.pdf
Tender Document • 1.49 MB
139254992.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .