| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.4 L+₹25,720.25 (2.53%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C.S.R ENTERPRISES | NSR AND COMPANY |
|---|---|---|---|---|---|
| 1.00 | Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete. | 44.4 | Rm | 62,160 ₹73,348.8 Lowest | 64,380 ₹75,968.4 |
| 2.00 | Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 3.6 | M3 | 16,560 ₹19,540.8 Lowest | 16,740 ₹19,753.2 |
| 3.00 | Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete. | 1.3 | M3 | 468 ₹552.24 Lowest | 481 ₹567.58 |
| 4.00 | Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete. | 42.7 | M2 | 2,135 ₹2,519.3 Lowest | 2,348.5 ₹2,771.23 |
| 5.00 | Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete. | 20.5 | M2 | 205 ₹241.9 Lowest | 225.5 ₹266.09 |
| 6.00 | Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer incharge including cost of labour, Lead lift, T&P etc., complete. | 88.5 | M2 | 4,425 ₹5,221.5 Lowest | 4,867.5 ₹5,743.65 |
| 7.00 | Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete. | 33.4 | M2 | 35,070 ₹41,382.6 Lowest | 35,738 ₹42,170.84 |
| 8.00 | Supplying, Cutting, bending & tying in position steel reinforcement wherever necessary using GI weld mesh of size 75 x 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials, labours, lead, lift, etc.complete. | 18 | M2 | 10,260 ₹12,106.8 Lowest | 10,440 ₹12,319.2 |
| 9.00 | Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 3.6 | M3 | 34,200 ₹40,356 Lowest | 34,272 ₹40,440.96 |
| 10.00 | Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete. | 180 | Kg | 17,100 ₹20,178 Lowest | 18,000 ₹21,240 |
Tender Value
Refer Docs
EMD Value
₹8,700
Closing Date
6 May 2025, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Renovation and Improvement works to Type 3 Quarters Block No. 8 to enhance the stability and aesthetic environments of the Quarters Building at Analmin Nagar
2025_EB_546627_1
CE SE C TTPS Spec. No 74 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,700
Yes
1 Sept 2025
16 Apr 2025
7 May 2025
16 Apr 2025
6 May 2025
16 Apr 2025
Providing two legged scaffolding for works above 3m height, using 13 to 15 cm dia casuarina props to a distance between the two rows are being 1.25m and the spacing of posts being 2m in both the rows with horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to stepup and providing a platform with country wood planks of 40mm thick and 1m width etc., including cost of all materials, labours, lead, lift, safety measures, etc.complete.
Dismantling the existing damaged RCC for the required width & depth as per the instructions of engineer incharge and disposing the debris 1km away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Dismantling of existing brick wall including cost of materials, labours and cleaning away from the work spot lead lift, curing, etc. complete.
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Clean removal of cracked cement plaster from walls including cost of all materials, labour, lead, lift, curing, etc., complete.
Dismantling the damaged Terrace tiles and disposed away from the site as directed by the engineer incharge including cost of labour, Lead lift, T&P etc., complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete.
Supplying, Cutting, bending & tying in position steel reinforcement wherever necessary using GI weld mesh of size 75 x 50 mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials, labours, lead, lift, etc.complete.
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
Providing PCC 1:4:8 using OP/PP cement with 12 to 20 mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Brick work in CM 1:5 using fly ash bricks (230x110x70mm) including cost of all materials, Labours, lead, curing, etc. complete.
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Plastering with CM 1:5, 12mm thick for brick wall surface including cost of all materials, labours, lead, lift, curing, etc., complete.
Applying one coat of white wash with white cement to the newly plastered surface, including cost of all materials, labours, lead, lift, scaffolding, curing, etc., complete
Providing Terrace tiles of single 200x200x20mm tiles using CM 1:3, mixed with crude oil 1% by weight of cement and pointing with same oiled mortar etc, including cost of all materials, lead, labours, lift curing etc., complete.
Providing two coats of Cement paint(snowcem) painting of approval colour & quality on new outer walls over one coat of white primer, including cost of all materials, scaffolding charges, labours, lead, lead, lift, curing, etc. complete.
Painting two coats with ready mixed enamel paint for the old wooden doors,windows including cost of all materials, through cleaning of surface, labours, lead, lift curing, etc. complete.
Supplying and fixing 6Kg/cm2 PVC pipe for sanitary arrangements of approved quality size of 110mm dia and 75mm dia including cost of specials, all other materials required labour, lead, lift, etc., complete. a) PVC Pipe 110 mm dia
b) PVC Pipe 75mm dia
Supplying laying and jointing in position of 15mm & 20mm dia GI pipes ('B' Class) as instructed by the site Engineer rate, including cost of all materials, labour, lead, lift, with necessary scaffolding etc., complete. a) 15mm dia GI Pipe
b) 20mm dia GI Pipe
Supplying and fixing GM Wheel valve of approved quality including cost of all materials, labour, lead, lift etc., complete a) 32mm Wheel valve
b) 25mm Wheel valve
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .