| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33,000Accepted-AOC | L1 | Accepted-AOC Agreement done | |
| 2 | L2₹13.7 L+₹17,698.43 (1.31%)Rejected-Finance S A 6 149 D 3 SHIV BIHAR COLONY AKTHA PAHADIYA VARANASI | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹13.8 L+₹20,487.84 (1.51%)Rejected-Finance | L3 | Rejected-Finance 3RD LOWEST | |
| 4 | L4₹13.8 L+₹22,607.01 (1.67%)Rejected-Finance | L4 | Rejected-Finance 4TH LOWEST | |
| 5 | L5₹14.4 L+₹82,257.10 (6.07%)Rejected-Finance | L5 | Rejected-Finance 5TH LOWEST |
Tender Value
₹16.4 L
EMD Value
₹33,000
Closing Date
14 Sept 2024, 5:00 pmClosed
EXECUTIV ENGINEER IRRIGATION DIVISION JAUNPUR
EXECUTIV ENGINEER IRRIGATION DIVISION JAUNPUR
Construction of V.R.B. at Km. 44.408 on Babatpur Dy.
2024_UPIDC_947478_2
01/E.E./2024-25
Open Tender
Civil Works
Item Rate
90 days
IRRIGATION DIVISION JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹33,000
7 Dec 2024
21 Aug 2024
16 Sept 2024
21 Aug 2024
14 Sept 2024
21 Aug 2024
Amount
Dismantling of brick work old damaged bridge and stacking of disposal material with in 100 meter.
Dismantling of R.C.C work old damaged bridge and stacking of disposal material with in 100 meter.
Earth work in foundation in ordianary soil/sandy loam, clay or sand including lift up to 1.50 meter and lead up to 30 meter and ncluding filling,warering, ramming of excavated earth in to the trenchs or up to the space and side of the foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by Engineer in charge up to a distance of 30 meter.from the foundation trenches.
Laying P.C.C. M-15 in foundation with cement,coarse sand & stone ballast 20 mm to 40 mm size including cost of all material & labour T&P etc.
Ist class brick work in 1:4 cement mortar with brick class -150, cement coarse sand including cost of all material & labour T&P etc.
Ist class brick work in 1:3 cement mortar with brick class- 150, cement coarse sand including cost of all material & labour T&P etc.
Cement pointing struck 1:2 cm. with cement,coarse sand including cost of all material and T&P etc.
Centering and shuttering for P.C.C&R.C.C. slab, including cost of all material, labour, T&P etc.
Reinforcement with cutting, bending, binding & placing in position ,including cost of all material, labour,T&P etc.
Laying R.C.C. M-20 (1:1.5:3) in with cement dalla stone grit 10 mm to 20 mm size with Chopan coarse sand including cost of all material & labour T&P etc.
Earth work in making road diversion in all kind of soil with all lead,lift and manual compaction and dressing etc.
Running of 5 HP generator set diesel pump for dewatering work arrangement of pump suction and delivery pipe, fule & lubricant for pump.
Earth work in making ramp in all type of soil with all lead, lift and manual compaction and dressing etc.
Earth work in making canal section with manual compaction and dressing U/S &D/S of V.R.B.
Dry brick on edge soling including preparation of subgrade & filling joints with local sand including cost of sand.
Providing and fixing of P.V.C.Pipe 110 mm dia for drainage spout and weep hole pipe.
Providing and fixing sign board including cost of all material. T&P etc.
Finishing wall with water proofing cement paint of approved quality and of required shade on new wall surface (two coats)over one coat of white cement primer to give an even shade after throughly brushing the surface to remove powdred materails including curring and cost of all materials.
M/s Ramesh Tiwari
KIRTI CONSTRUCTION
M/S G.S. CONSTRUCTION
M/S DILAWAL SINGH
M/s Lal Mohan Yadav
S.B. ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .