Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -46.00% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹30,006.16 (11.1%)Admitted-Finance | -40.00% | ₹3.0 L+₹30,006.16 (11.1%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹40,008.21 (14.8%)Admitted-Finance | -38.00% | ₹3.1 L+₹40,008.21 (14.8%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 L+₹52,510.77 (19.4%)Admitted-Finance | -35.50% | ₹3.2 L+₹52,510.77 (19.4%) | L4 | Admitted-Finance |
| 5 | L5₹3.6 L+₹85,017.44 (31.5%)Admitted-Finance | -29.00% | ₹3.6 L+₹85,017.44 (31.5%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
30 Apr 2026, 2:00 pmClosed
General Manager (Works)
Office of Addl. CEO. SASB
Construction of Concrete paths from main track to Toilet Blocks 750 ft x 5 ft to avoid the slips to Yatries during rainy days at Sheshnag Camp. for Yatra- 2026.
2026_SASB_308181_7
SASB/eNIT/2026/10
Open Tender
Civil Works
Percentage
21 days
Pahalgam Axis
Please refer Tender documents.
2 documents required · 2 mandatory
₹472
J and K Bank 0110040100014077
₹10,000
5 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. | 174.25 | Sqm | 89.4 | ₹15,577.95 |
| 2 | providing and laying of soling stone for laying on bed foundation including all carriages of material all complete: | 26.5 | cum | 900 | ₹23,850 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) for sides of paths | 29.5 | Cum | 6,217.8 | ₹1,83,425.1 |
| 4 | Centering and shuttering including strutting, propping etc. Removal of frame work for foundations, footings, bases of columns etc. for mass concrete. | 69.7 | Sqm | 280.1 | ₹19,522.97 |
| 5Carriage of material by M. Transport from market to Chandanwari Avg. distance 50 Km | |||||
| 5.01 | Cement for Cont. work | 6 | Mt | 652.95 | ₹3,917.7 |
| 6 | Head load of cement from Chandanwari to Sheshnag by Ponies | 60 | Pony | 2,000 | ₹1,20,000 |
| 7 | head load of Sand and aggregates from Avg. 3 Km lead | 37.84 | Cum | 2,708.4 | ₹1,02,485.86 |
| 8 | head load of Soling s from Avg.1.00 Km lead | 26.5 | Cum | 1,182 | ₹31,323 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_999023.xls
BOQ • 0.34 MB
DEALLL.pdf
PDF • 0.07 MB
DEALL.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .