Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹3.0 L+₹4,064.40 (1.39%)Rejected-AOC | L2 | Rejected-AOC accepted | |
| 3 | L3₹3.3 L+₹34,953.82 (12.0%)Rejected-AOC | L3 | Rejected-AOC accepted | |
| 4 | L4₹3.3 L+₹37,189.24 (12.7%)Rejected-AOC | L4 | Rejected-AOC accepted | |
| 5 | L5₹3.5 L+₹53,284.25 (18.2%)Rejected-AOC | L5 | Rejected-AOC accepted |
Tender Value
₹4.1 L
EMD Value
₹5,000
Closing Date
13 Jul 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE ZONAL OFFICER
THE ZONAL OFFICER
Providing at Road side Garbage Bins Point at EB Salai (Near BSNL office) in Division 92, Unit-20,Zone 7
2026_CoC_683819_1
Z.O.VII.C.NO.E1/3512/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
24 Aug 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Lime Concrete | 20 | CUM | 378.64 | ₹7,572.8 |
| 2 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 26 | CUM | 368.55 | ₹9,582.3 |
| 3 | Sectioning The Site And Levelling To Camber | 88 | SQM | 8.61 | ₹757.68 |
| 4 | Providing and Laying Granular sub base (GSB) by pr...complete as per clause of 401 Morth Specification | 9 | CUM | 2,060.54 | ₹18,544.86 |
| 5 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 9 | CUM | 2,709.1 | ₹24,381.9 |
| 6 | Providing And Laying In Position, Standarded Concr... The Department For The Excess Usage of Materials) | 15 | CUM | 9,238.39 | ₹1,38,575.85 |
| 7 | Supplying and erecting steel centering including n...I be given after the concrete is laid). FOUNDATION | 9 | SQM | 756.34 | ₹6,807.06 |
| 8 | Painting the wall two coats with approved weather ...tion and as directed by the departmental officers. | 18 | SQM | 260.88 | ₹4,695.84 |
| 9 | Roofing with Galvanised corrugated iron sheet of thickness 0.8mm | 165 | SQM | 1,079.12 | ₹1,78,054.8 |
| 10 | Supplying and erecting in position LIGHT DUTY STE... CYCLE STAND, P. | 85 | KGS | 205.49 | ₹17,466.65 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
TENDERDOCUMEN.pdf
Tender Documents • 1.43 MB
BOQ_821988.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .