Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Finance | -43.51% | ₹1.0 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 L+₹18,219.02 (17.9%)Admitted-Finance 00 MEERANPUR SADARALI FAREEDPUR KALAN TANDA AMBEDKAR NAGAR UTTAR PRADESH 224145 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | -33.42% | ₹1.2 L+₹18,219.02 (17.9%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 L+₹33,422.61 (32.8%)Admitted-Finance R 35 NAVEEN NAGAR MDA COLONY MORADABAD | MORADABAD | UTTAR PRADESH | 244001 | -25.00% | ₹1.4 L+₹33,422.61 (32.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 L+₹37,665.89 (36.9%)Admitted-Finance | -22.65% | ₹1.4 L+₹37,665.89 (36.9%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 L+₹58,972.57 (57.8%)Admitted-Finance | -10.85% | ₹1.6 L+₹58,972.57 (57.8%) | L5 | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹18,100
Closing Date
4 Aug 2026, 10:00 amClosed
SP BIJNOR
SP OFFICE BIJNOR
POLICE LINE ME TRAFFIC OFFICE KE PICHE NIRMIT BARACK NO 03 WA 04 KI ANDAR TAILES, PUTTI PAINT, DOOR WINDOW LAGANE KA KARYA
2026_UPPOL_1172771_1
LINE ME TRAFFIC OFFICE KE PICHE BARACK 03 WA 04 KI ANDAR TAILES PUTTI PAINT, DOOR WINDOW LAGANE WORK
Open Tender
Repair and Maintenance Works
Percentage
30 days
SP OFFICE BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SP BIJNOR
₹18,100
12 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scrapping old white or colour washing including disposal of refuse with in a distance of 60 m (SI.NO. 708) | 149.7 | Sqm | 14 | ₹2,095.8 |
| 2 | Providing wall putty on old surface with approved quality material of berger/JK Birla or similar make 2 coats. As per Ch. 15 new item no. 12. | 149.7 | Sqm | 47 | ₹7,035.9 |
| 3 | Providing Cement Primer on old/new surface including cost of all materials, labour and T&P etc. as per Ch. No. 15 New item No. 10 | 149.7 | Sqm | 23 | ₹3,443.1 |
| 4 | Distempring 2 coat with oil bound distemper of approved brand and manufacture and required shade on undecorated wall surface to with an even shade over and including a primer coat with cement primer of approved brand and manufacture such as of British, 'Shalimar asian paint after throughtly brushing the surface free from mortar droppings and other froeign matter and also including preparing the surface even and sand prepared smooth including cost of all materials. As per S.I. No. 649+650. | 299.4 | Sqm | 104 | ₹31,137.6 |
| 5 | Painting two coat over priming coat (excluding cost of priming coat) on wood or steel and other metal suface with superior synthetic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface all durt dust and other foreing metter sand papering and stripping including cost matter and scoured with wire brushes fiinie steel/wood scrappers sand papering and knotting including coat of all and supply of all materials, labour and T&P etc required for proper completion of the work. As per Ch. 14 New item No. 2+3(iii). | 15.6 | Sqm | 55 | ₹858 |
| 6 | Providing and laying vitrified floor tiles (BELL/KAJARIA/SOMANI or other standard make) in different sizes (thickness to be specified by the manufacturer) with waer absoption's less than 0.08% and conforming to IS:15622 of approved make in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including grouting the joints the joints with white cement and matching pigments etc. complete size of tile 60x60 cm. Ch. 14 new item no. 4. | 82.14 | Sqm | 1,185 | ₹97,335.9 |
| 7 | Supply and fixing of 32 mm thick flush doors commercial quality conforming to I.S. 2202 Part I (1983) including fixing of wooden cleats and stoppers and including fixing and adjustment of hinges bolts locks handles springs fitting and necessary screws to be supplied. As per S.I. No. 470(i). | 7.8 | Sqm | 1,425 | ₹11,115 |
| 8 | Add GST 18% | 1 | Job | 27,543.83 | ₹27,543.83 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_2202323.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .