Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | -36.55% | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance | -33.01% | ₹6.2 L | L2 | Admitted-Finance |
| 3 | L3₹6.4 LAdmitted-Finance | -31.00% | ₹6.4 L | L3 | Admitted-Finance |
| 4 | L4₹6.5 LAdmitted-Finance | -30.10% | ₹6.5 L | L4 | Admitted-Finance |
| 5 | L5₹6.6 LAdmitted-Finance | -29.15% | ₹6.6 L | L5 | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹18,640
Closing Date
15 May 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Boundary Wall at Govt. Higher Secondary school Hajin.
2026_PWDJK_309544_1
NIT NO 10 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
30 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division
₹18,640
19 May 2026
8 May 2026
16 May 2026
8 May 2026
15 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismentaling / Domolishing old damaged chain link /GI fancying and site clarences etc complete job | 1 | No | 9,000 | ₹9,000 | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m in all kinds of soil | 26.55 | Cum | 187.3 | ₹4,972.82 | BI01010001010000000000000515BI0100001114 |
| 3 | Providing & Laying of stone soling (dully hand packed) including dressing and ramming with all carriages loading un-loading and stacking etc complete, 75mm size. | 5.26 | Cum | 1,000 | ₹5,260 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering. All works upto plinth level in M-7.5 grade (1:4:8) mix with 20mm nominal size of stone aggregates including curing. | 3.98 | Cum | 5,202.9 | ₹20,707.54 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering. All works upto plinth level in M-10 grade (1:2:4) mix with 20mm nominal size of stone aggregates including curing.. | 54.18 | Cum | 6,591.25 | ₹3,57,113.93 | BI01010001010000000000000515BI0100001115 |
| 6 | Providing form work including strutting , propping and removal of form work ; foundation and plinth using Kit ply. | 230.02 | sqm | 286.35 | ₹65,866.23 | BI01010001010000000000000515BI0100001116 |
| 7 | Brick work with F.P.S bricks of class designation 75in 1:6 (cement: sand) mortar incl. Extra for brick work in superstructure above plinth level | 26.93 | Cum | 9,027.2 | ₹2,43,102.5 | BI01010001010000000000000515BI0100001117 |
| 8 | Providing Steel rainforcement Incl. straightening cutting , bending , placing in position and binding all complete | 506.25 | kg | 123 | ₹62,268.75 | BI01010001010000000000000515BI0100001118 |
| 9 | Providing and laying cement concrete copping 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 17.67 | sqm | 416.5 | ₹7,359.56 | BI01010001010000000000000515BI0100001119 |
| 10 | 12mm Cement plaster on the rough side of single or half brick wall of 1:6 mix | 271.84 | sqm | 283.8 | ₹77,148.19 | BI01010001010000000000000515BI0100001120 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_1002014.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid