| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.2 CrAdmitted-Finance BEHIND HERO HONDA SHOWROOM DUDHANI BHAGALPUR ROAD DUMKA | DUMKA | JHARKHAND | 814101 | L1 | Admitted-Finance | |
| 2 | L2₹49.3 Cr+₹2.1 Cr (4.53%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹49.6 Cr+₹2.4 Cr (5.04%)Admitted-Finance 3D VATIKA APARTMENT LINK TANK ROAD RANCHI | RANCHI | JHARKHAND | 829205 | L3 | Admitted-Finance | |
| 4 | L4₹49.6 Cr+₹2.5 Cr (5.22%)Admitted-Finance AT PROFESSOR COLONY P O MAITHON DIST DHANBAD 828207 | DHANBAD | JHARKHAND | 828207 | L4 | Admitted-Finance | |
| 5 | L5₹55.1 Cr+₹7.9 Cr (16.8%)Admitted-Finance 3 6 H S TOWER L ROAD BISTUPUR JAMSHEDPUR JHARKHAND 831001 | EAST SINGHBUM | JHARKHAND | 831001 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CLASSIC ENGICON PVT. LTD. L3 | M/S SANJAY CONSTRUCTION L4 | TRIVENI ENGICONS PRIVATE LIMITED L5 | HARI NANDAN CHOUDHARY L1 | UNIVERSAL AGENCY RAMGARH PRIVATE LIMITED L6 | M/s SILDILIYA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing the road land,(Clearing and grubbing the road land including uprooting rank vegetation,grass, bushes,shrubs,saplings and trees girth upto 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of sercviceable materials to be used or auctioned upto a lead of 1000 mts. including removal and disposal of organic soil not exceeding 150mm in thickness. | 9.9 | HECT | 35,000 ₹3,46,570 | 84,074.52 ₹8,32,505.95 | 34,100 ₹3,37,658.2 Lowest | 73,711.23 ₹7,29,888.6 | 56,204 ₹5,56,532.01 | 40,000 ₹3,96,080 |
| 2.00 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 300-600mm | 33 | Each | 150 ₹4,950 Lowest | 428.89 ₹14,153.37 | 490 ₹16,170 | 510.32 ₹16,840.56 | 630.7 ₹20,813.1 | 300 ₹9,900 |
| 3.00 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 600-900 mm | 19 | Each | 150 ₹2,850 Lowest | 647.92 ₹12,310.48 | 490 ₹9,310 | 770.93 ₹14,647.67 | 1,025.6 ₹19,486.4 | 500 ₹9,500 |
| 4.00 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 900-1800mm | 70 | Each | 150 ₹10,500 Lowest | 1,004.36 ₹70,305.2 | 780 ₹54,600 | 1,195.04 ₹83,652.8 | 1,435.8 ₹1,00,506 | 800 ₹56,000 |
| 5.00 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metresCutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres>1800mm | 9 | Each | 150 ₹1,350 Lowest | 1,780.59 ₹16,025.31 | 1,180 ₹10,620 | 2,118.65 ₹19,067.85 | 3,543.7 ₹31,893.3 | 1,500 ₹13,500 |
| 6.00 | Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately | 51 | Each | 150 ₹7,650 | 129.57 ₹6,608.07 | 150 ₹7,650 | 154.17 ₹7,862.67 | 265.1 ₹13,520.1 | 100 ₹5,100 Lowest |
| 7.00 | Removal of Hand pumps all complete job as per specification and direction of E/I | 1 | Each | 1,000 ₹1,000 | 700 ₹700 | 150 ₹150 Lowest | 832.9 ₹832.9 | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 8.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
Rubble stone masonry in cement mortar | 437.13 | M3 | 350 ₹1,52,995.5 | 214.73 ₹93,862.74 | 150 ₹65,569.5 Lowest | 238.46 ₹1,04,238.02 | 276.3 ₹1,20,779.02 | 150 ₹65,569.5 Lowest |
| 9.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. By Machenical Means, (ii) PCC M15 and above | 71.64 | M3 | 350 ₹25,074 | 489.6 ₹35,074.94 | 245 ₹17,551.8 | 543.72 ₹38,952.1 | 420.4 ₹30,117.46 | 200 ₹14,328 Lowest |
| 10.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. By Machenical Means
(iii) RCC M20 and above | 657.35 | M3 | 350 ₹2,30,072.5 | 665.25 ₹4,37,302.09 | 290 ₹1,90,631.5 Lowest | 738.78 ₹4,85,637.03 | 880 ₹5,78,468 | 300 ₹1,97,205 |
Tender Value
₹56.7 Cr
EMD Value
₹57 L
Closing Date
22 Aug 2025, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Bokaro
Executive Engineer, RCD, Road Division, Bokaro
Four Laning from Bokaro Sector -6 (Shastri Chowk) to Telmachcho (NH-32) Road (Total Length 5.965 Km) Under Road Division, Bokaro for the year 2025-26 (Job. No. CRF-JHR-2025-26-77)
2025_CECOM_103642_1
RCD/BOKARO/979/F.Y./2025-26
Open Tender
Civil Works
Item Rate
665 days
Bokaro Sector 6 (Shastri Chowk) to Telmachcho Rd
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹57 L
C.E. (Comm), RCD, Jharkhand, Ranchi
30 Apr 2026
31 Jul 2025
25 Aug 2025
31 Jul 2025
22 Aug 2025
31 Jul 2025
13 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing the road land,(Clearing and grubbing the road land including uprooting rank vegetation,grass, bushes,shrubs,saplings and trees girth upto 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of sercviceable materials to be used or auctioned upto a lead of 1000 mts. including removal and disposal of organic soil not exceeding 150mm in thickness. | 1 | HECT | - | - |
| 2 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 300-600mm | - | Each | - | - |
| 3 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 600-900 mm | - | Each | - | - |
| 4 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres, 900-1800mm | - | Each | - | - |
| 5 | Cutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metresCutting of trees, excluding removal of stumps and roots of trees Cutting of trees stacking of serviceble material with all lifts and up to a lead of 1000 metres>1800mm | - | Each | - | - |
| 6 | Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately | - | Each | - | - |
| 7 | Removal of Hand pumps all complete job as per specification and direction of E/I | - | Each | - | - |
| 8 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres
Rubble stone masonry in cement mortar | 1 | M3 | - | - |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. By Machenical Means, (ii) PCC M15 and above | - | M3 | - | - |
| 10 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. By Machenical Means
(iii) RCC M20 and above | - | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
crf979.rar
Tender Documents • 4.86 MB
BOQ_139115.xls
BOQ • 0.35 MB
BOQ.xls
BOQ • 0.35 MB
Tenderdocument.rar
Tender Documents • 4.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .