Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.9 LAccepted-AOC | ₹42.9 L | L1 | Accepted-AOC AWARDED BEING L1 |
| 2 | L2₹43.2 L+₹31,104.51 (0.72%)Rejected-Finance AT BIDYUT COLONY P O VIKRAMPUR FCI TALCHER DIST ANGUL ODISHA 759116 | TALCHER | ANGUL | ODISHA | 759116 | ₹43.2 L+₹31,104.51 (0.72%) | L2 | Rejected-Finance REJECTED FOR NOT BEING REVISED L-1 BIDDER |
| 3 | L3₹49.1 L+₹6.2 L (14.5%)Rejected-Finance | ₹49.1 L+₹6.2 L (14.5%) | L3 | Rejected-Finance REJECTED NOT BEING L-1 |
| 4 | L4₹54.1 L+₹11.2 L (26.1%)Rejected-Finance ANANTA OCP JAGANNATH AREA | ANUGUL | ODISHA | 759103 | ₹54.1 L+₹11.2 L (26.1%) | L4 | Rejected-Finance REJECTED NOT BEING L-1 |
| 5 | Rejected-Technical AT PO DANARA PS COLLIERY DIST ANGUL ODISHA 759103 | DANARA | ANGUL | ODISHA | 759103 | - | - | Rejected-Technical REJECTED FOR NON COMPLIANCE OF WORK EXPERIENCE |
Tender Value
₹62.2 L
EMD Value
₹77,800
Closing Date
21 Apr 2026, 5:00 pmClosed
STAFF OFFICER CIVIL BHARATPUR AREA
STAFF OFFICER CIVIL BHARATPUR AREA N.S.NAGAR ANGUL ODISHA-759148
Renovation and Repair Works Of Various Union Office Under Bharatpur Area
2026_MCL_357962_1
GM(BA)/SO(C)/e Tender/2026-27/06 Dt.03.04.2026
Open Tender
Civil Works - Buildings
Percentage
150 days
BHARATPUR AREA
AS PER NIT
5 documents required · 5 mandatory
₹77,800
10 Jul 2026
6 Apr 2026
23 Apr 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
6 Apr 2026 - 14 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | - | CUM | - | - |
| - | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | - | CUM | - | - |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | - | cum | - | - |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - |
| - | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| - | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| - | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| - | 12 mm cement plaster of mix:1:6(1 cement: 6 fine sand) | - | sqm | - | - |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.39 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_370847.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .