Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹19.7 LAccepted-AOC KBNDUA BOARIJOR GODDA 814165 JHARKHAND INDIA | GODDA | GODDA | JHARKHAND | 814165 | ₹19.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹20.9 LRejected-Finance AT LOHANDIA BAZAR PO LOHANDIA BAZAR DIST GODDA BIHAR 814165 | LOHANDIA BAZAR | GODDA | BIHAR | 814165 | ₹20.9 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹21.6 LRejected-Finance | ₹21.6 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹19.7 L
EMD Value
₹24,600
Closing Date
30 Mar 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Construction of RCC drain with cover slab from plot no.JK01 to J12 at Bara Simra rehab site under Rajmahal Area.
2026_ECL_357157_1
ECL/RJML/AGM/AE(C)/ e-Ten/25-26/720 Dt-19.03.2026
Open Tender
Civil Works - Others
45 days
Bara Simra rehab site
Please refer Tender documents.
3 documents required · 3 mandatory
₹24,600
3 May 2026
19 Mar 2026
31 Mar 2026
19 Mar 2026
30 Mar 2026
19 Mar 2026
19 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Item Description/ Heading | ||||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | ||||||
| 3 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | Cum | - | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | Cum | - | - | - |
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | ||||||
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | kg | - | - | - |
| 7Centering and shuttering including strutting, propping etc. and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | ||||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | ||||||
| 9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | ||||||
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001125 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_370025.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.10 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_370025.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid