Tender Value
₹77.0 L
EMD Value
₹1.5 L
Closing Date
6 Sept 2026, 6:00 pm
SUPERDENTING ENGINEER WDSC BANSWARA
OFFICE OF SUPERDENTING ENGINEER WDSC BANSWARA
CONSTRUCTION OF MPT
2026_WDSC_592417_1
MJSA2.3 NIT 07/2026-27 BLOCK ARTHOONA
Open Tender
Civil Works
Percentage
BANSWARA
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹1,000
SE WDSC Banswara
₹1.5 L
Yes
25 Aug 2026
25 Aug 2026
7 Sept 2026
25 Aug 2026
6 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dagbelling 5 to 7.5 cm deep | 11,508 | Rm | 1.71 | ₹19,678.68 |
| 2 | Clearance of Jungle and cutting of ordinary vegetation shrubs and bushes | 57,540 | Sqm | 2.86 | ₹1,64,564.4 |
| 3 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m | 7,357.5 | Cum | 10.94 | ₹80,491.05 |
| 4 | Earth work in rough (borrow area) excavation with JCB or Scraper, for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250 m and lift up to 3m (excluding charges for compaction and watering), including loading and un-loading wherever required complete in all respect. | 44,988.11 | Cum | 80.25 | ₹36,10,295.43 |
| 5 | Watering of earth including cost of carriage of water when source of water is up to 3 km lead | 44,988.11 | Cum | 20.34 | ₹9,15,058.06 |
| 6 | Compaction of earth or highly weathered strata By manually or plain roller. (density 90% of Proctor) | 44,988.11 | Cum | 22.5 | ₹10,12,232.36 |
| 0.9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. 11.1-Hard soil mixed with Kankar / boulders, Morrum | 2,380.98 | Cum | 106.2 | ₹2,52,860.08 |
| 0.0 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. 11.2-Soft / Disintegrated rock | 1,020.42 | Cum | 144.9 | ₹1,47,858.86 |
| 8 | Dry Stone Pitching 15 to 30 centimeter thick with hammer dressed including all lifts and including supply of stone | 929.22 | Cum | 1,312.28 | ₹12,19,396.82 |
| 9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Hard soil mixed with kankar and murram | 5.92 | Cum | 178.46 | ₹1,056.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
termsandconditions.pdf
Tender Documents • 2.90 MB
BOQ_1051834.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].