Tender Value
₹12.9 Cr
EMD Value
₹10 L
Closing Date
14 Sept 2026, 2:00 pm
Superintending Engineer/W.H.C.1/P.W.(R)D.
Office of the Superintending Engineer, Western Highway Circle No.-I, Purta Bhavan 1st Floor, Burdwan, Purba Bardhaman. 713103.
Rajgram Mohorapur Rd from 0.00km to 1.50km, Strengthening Work (5.50m - Intermediate Lane) and from 1.50km to 6.50km W and S Work (Single Lane to Intermediate Lane) under Birbhum Highway Division No I in the district of Birbhum Under RIDF-XXXII.
2026_WBPWD_5019160_5
WBPW(R)D/NIT- 02 of SE/WHC-I/2026-2027
Open Tender
CIVIL WORKS
Percentage
220 days
Burdwan
Please refer Tender documents.
8 documents required · 8 mandatory
₹10 L
Yes
Off of the S.E./W.H.C.1/P.W.(R)D.
18 Aug 2026
18 Aug 2026
16 Sept 2026
18 Aug 2026
14 Sept 2026
25 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PAVEMENT WORKS : | |||||
| 1.01 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301).
Rate is Including 1.0% Cess. | 3,638.73 | cum | 85.55 | ₹3,11,293.35 |
| 1.02 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course
Rate is Including 1.0% Cess. | 1,717.99 | cum | 312.86 | ₹5,37,490.35 |
| 1.03 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Manual Means
Bituminous course
Rate is Including 1.0% Cess. | 1,634.96 | cum | 587.83 | ₹9,61,078.54 |
| 1.04 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Land owned /Arranged by the Contractor. Carried earth. Lead upto 5km.
Rate is Including 1.0% Cess. | 7,198.14 | cum | 220.72 | ₹15,88,773.46 |
| 1.05 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Land owned /Arranged by the Department. Lead upto 5km.
Rate is Including 1.0% Cess. | 7,198.14 | cum | 168.17 | ₹12,10,511.2 |
| 1.06 | Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification.
The compaction factor is 0.70.
(The payment is to be made on the basis of the finished compacted volume of stone dust.)
Rate is Including 1.0% Cess. | 1,437.88 | cum | 1,319.78 | ₹18,97,685.27 |
| 1.07 | Granular Sub-Base with Graded Material (Table:- 400-1)
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401.
For grading-II
Rate is Including 1.0% Cess. | 768.57 | cum | 1,857.17 | ₹14,27,365.15 |
| 1.08 | Granular Sub-Base with Graded Material (Table:- 400-1)
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401.
For grading-III
Rate is Including 1.0% Cess. | 768.57 | cum | 2,176.6 | ₹16,72,869.46 |
| 1.09 | Granular Sub-Base with Graded Material (Table:- 400-1)
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401.
For grading-V.
Rate is Including 1.0% Cess. | 1,437.87 | cum | 2,032.72 | ₹29,22,787.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5091023.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].