| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.7 L+₹45,725.70 (8.67%)Admitted-Fee/PreQual/Technical/Finance | ₹5.7 L+₹45,725.70 (8.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | J Sankaran L1 | Perumal S L2 |
|---|---|---|---|---|---|
| 1.01Providing New Bore well and New Motor Accessories for Manthoppu Paguthi in Omipper panchayat , Providing Main pipe line for Mariyamman koil street at Omipper panchayat merkanam Block | |||||
| 1.02 | Cost of Geophysical Investigation Charges | 1 | Cum | 2,000 ₹2,000 Lowest | 4,000 ₹4,000 |
| 1.03 | Cost of 200mm dia PVC Casing pipe | 3 | Cum | 766.4 ₹2,299.2 Lowest | 1,000 ₹3,000 |
| 1.04 | 200mm dia pvc Slotted pipes | 52 | Cum | 1,314.9 ₹68,374.8 Lowest | 2,000 ₹1,04,000 |
| 1.05 | 200mm dia End cap | 1 | Sqm | 201.3 ₹201.3 Lowest | 300 ₹300 |
| 1.06 | Drilling of borewell in Sedimetary area anywhere in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles including by first taking a pilot bore of 140 mm/150mm direct or reverse rotatry mud and circulation method using rotary rig , fuel, labour, drilling, betonite mud and water required for drilling at the site. Site will be shown by the Departmental officers officers icluding construction of mud pit using rotary rig are to be used. up to 60.00 m depth | 55 | Sqm | 1,282.08 ₹70,514.4 Lowest | 1,282.08 ₹70,514.4 Lowest |
| 1.07 | Labour charges for inserting PVC casing pipes (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement pasete etc., complete supply and packing the annular space with pebbles of size & quality as approved by the Executive Engineer,Departmental officers Board, 165 mm Casing assembly. | 55 | Cum | 441.4 ₹24,277 Lowest | 441.4 ₹24,277 Lowest |
| 1.08 | Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed by the Departmental officers Board Officers upto 60m depth ending from ground lev | 55 | Cum | 447.78 ₹24,627.9 Lowest | 447.78 ₹24,627.9 Lowest |
| 1.09 | Charges for developing the borewells with Air compressor of 600 CFM capacityincluding transportation labour and fuel charges for compressor as directed by Departmental officers Board officers and conducting yield test by "V" notch methods | 8 | Cum | 2,246.51 ₹17,972.08 Lowest | 2,246.51 ₹17,972.08 Lowest |
| 1.10 | Cost and supply of 5 HP Three phase submersible motor as per IS 8034 without panel board of125 lpm x 225lpm. Wdm 1653 | 1 | Sqm | 58,450 ₹58,450 Lowest | 58,450 ₹58,450 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,283
Closing Date
22 Sept 2026, 3:00 pmClosed
President Omipper Panchayat
Omipper Panchayat Office
Providing New Bore well and New Motor Accessories for Manthoppu Paguthi in Omipper panchayat , Providing Main pipe line for Mariyamman koil street at Omipper panchayat
2026_RDTN_702217_1
15th CFC/2025-26/Omipper/pipeline
Open Tender
Civil Works
Works
Omipper Panchayat Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,283
Yes
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing New Bore well and New Motor Accessories for Manthoppu Paguthi in Omipper panchayat , Providing Main pipe line for Mariyamman koil street at Omipper panchayat merkanam Block | - | - | - | - |
| 1.02 | Cost of Geophysical Investigation Charges | 1 | Cum | 3,000 | ₹3,000 |
| 1.03 | Cost of 200mm dia PVC Casing pipe | 3 | Cum | 766.4 | ₹2,299.2 |
| 1.04 | 200mm dia pvc Slotted pipes | 52 | Cum | 1,314.9 | ₹68,374.8 |
| 1.05 | 200mm dia End cap | 1 | Sqm | 201.3 | ₹201.3 |
| 1.06 | Drilling of borewell in Sedimetary area anywhere in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles including by first taking a pilot bore of 140 mm/150mm direct or reverse rotatry mud and circulation method using rotary rig , fuel, labour, drilling, betonite mud and water required for drilling at the site. Site will be shown by the Departmental officers officers icluding construction of mud pit using rotary rig are to be used. up to 60.00 m depth | 55 | Sqm | 1,282.08 | ₹70,514.4 |
| 1.07 | Labour charges for inserting PVC casing pipes (with slots or without slots) in the drilled hole including jointing the pipes with PVC couplers with cement pasete etc., complete supply and packing the annular space with pebbles of size & quality as approved by the Executive Engineer,Departmental officers Board, 165 mm Casing assembly. | 55 | Cum | 441.4 | ₹24,277 |
| 1.08 | Reaming from 140mm/150mm dia pilot bore to 300mm dia bore as directed by the Departmental officers Board Officers upto 60m depth ending from ground lev | 55 | Cum | 447.78 | ₹24,627.9 |
| 1.09 | Charges for developing the borewells with Air compressor of 600 CFM capacityincluding transportation labour and fuel charges for compressor as directed by Departmental officers Board officers and conducting yield test by "V" notch methods | 8 | Cum | 2,246.51 | ₹17,972.08 |
| 1.1 | Cost and supply of 5 HP Three phase submersible motor as per IS 8034 without panel board of125 lpm x 225lpm. Wdm 1653 | 1 | Sqm | 58,450 | ₹58,450 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
tender.pdf
Tender Documents • 0.31 MB
BOQ_844149.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .